TxDOT August 2013 Projects

Print Print this Article | Send to Colleague

The TxDOT highway letting is scheduled for August July 9th and 10th. The total tonnage of  asphalt pavements being let is 1,304,080.              


# COUNTY HWY
TYPE TONS
1 ARCHER US277 WIDEN NON-FREEWAY 35,022
2 BASTROP US290 WIDEN GR STRS BS & SURF 148,773
3 BLANCO US281 UPGRADE TO SUPER 2 29,636
4 BRAZORIA CR GR, STRS, BASE AND PAVE 13,703
5 BRAZOS FM974 ROADWAY RESTORATION 849
6 CALDWELL US183 RECONSTRUCT TO 5-LN URBAN SECTION 32,193
7 DALLAM SS24 NEW LOCATION 2 LANE RDWY 5,661
8 DALLAS IH35E FULL DEPTH REPAIR 1,223
9 DALLAS FM1382 INTERSECTION IMPROVE 1,870
10
DAWSON SH349 GR, BASE, ACP, STR 1,249
11
DENTON US377 REHAB AND WIDEN BRIDGE AND APPROACH 5,341
12
DEWITT SH72 RESTORATION OF EXISTING ROADWAY 5,713
13 ECTOR US385 INTERSECT IMPROVE 2,104
14 EL PASO IH10 INTERCHANGE IMPROVE 34,513
15
EL PASO SH20 ROADWAY IMPROVEMENT 10,380
16 EL PASO US62 WIDEN ROADWAY FROM 4 TO 6 LANE 3,735
17 EL PASO SH20 INTERSECT IMPROVE 19
18 EL PASO FH258 REPLACE STRUCTURE 362
19 EL PASO CS PASEO DEL NORTE IMPROVEMENTS 460
20 ERATH US67 GRADING, DRAINAGE, STRUCTURES & PAV 53,165
21
FT. BEND CR REPLACE BRIDGE AND APPROACHES  96
22
FT. BEND SP10 GR, STRS, BASE & SURF 16,408
23
GALVESTON FM2004 INTERSECT IMPROVE 8,832
24
GALVESTON FM518 MANAGEMENT IMPROVE 4
25
GRAYSON US75 MISC CONSTRUCTION 1,242
26
GRAYSON US75 REHABILITATION OF EXISTING ROADWAY 18,284
27
GREGG FM349 GRD,CMT TRT SBGR,FLX BS,OCST,STRS 1,749
28
GREGG US259 SBG WDN,HMAC BS&SURF,OCST,MBGF,SIGN 2,187
29
GREGG FM2275 GR,STRS,ACP BS&SURF,CONC PVT,OCST 35,947
30
HARRIS BF1960 BS REP, MILL, SC INTERLAYER, OL 29,946
31
HARRIS FM865 GR, BS & SURF 3,120
32
HARRIS VA PED & SIG IMPRVMTS IN AIRLINE DIST 811
33 HARRIS IH610 ACP O/L 3,719
34
HARRIS SH3 ADD RT LN, RR WORK, W/SIGNALS 3,192
35
HARRIS CR REPLACE BRIDGE 753
36 HARTLEY US54 REPLACE BRIDGE & APPR 748
37
HAYS IH35 WDN XSTING BRG &ADD TURNAROUND BRGS 20,277
38 HAYS FM2439 ADD CENTER TURN LANE 11,429
39 HAYS IH35 REPLACE BRIDGE 13,061
40 HAYS SH80 INTERSECTION IMPROVE 12,863
41 HAYS RM12 INSTALL CENTER TURN LANE & SHLDRS 6,249
42 HIDALGO FM494 SIGNAL RETIMING & ADD LANES @ US 83 1,294
43 JOHNSON CR GR, BS, STRUCTURE 125
44 JOHNSON SH174 GR, BS, PAVEMENT AND SIGNAL 95
45 KARNES SH72 GRADE,BASE,SURF,STRS 130,297
46 LEE US290 WIDEN ROADWAY TO ADD TURN LANE  8,333
47 LIBERTY FM1413 GR, BS, STR, PVT. 6,338
48 LIBERTY FM787 REPLACE BRIDGE AND APPROACHES 153
49 MENARD US83 ADD PASSING LANES 18,241
50 MONTGMERY LP336 WIDEN TO 4 LANES 2,767
51 NAVARRO SH14 REPLACE EXISTING RAILROAD UNDERPASS 5,263
52 NEWTON FM1013 EDGE STABILIZATION  1,635
53 NUECES FM361 GRD,BASE,STRS,STORM SEWER,C &G,SIDE 22,480
54 NUECES FM2444 GRADE, BASE, SURF,STRTS 63,214
55 NUECES VA INTERSECTION IMPROVE 47,680
56 NUECES VA INTERSECTION IMPROVE 9,022
57 PANOLA FM3324 GR,BS, DR, STRUC AND PAVEMENT 4,324
58 RANDALL LP335 ADDITIONAL 2 LANES AND BRIDGES 66,380
59 ROBERTSON SH7 MILL AND INLAY HMA 5,022
60 ROCKWALL FM740 GRADING,STRUCTURES,DRAINAGE, & PVMT 27,780
61 SAN PATCIO SH361 MILL & OVERLAY 5,480
62 SAN PATCIO FM1068 WIDEN ROADWAY 3,795
63 TARRANT FM1220 GRADING, BASE AND PAVEMENT 34,834
64 TARRANT CS REPLACE BRIDGE 10,179
65 TARRANT CS INTERSECTION IMPROVE 516
66 TARRANT SH26 CROSSWALKS,ADA RAMPS & IMPROVEMENT 71
67 TARRANT FM156 GR, BS, AND PAVEMENT 824
68 TRAVIS SH71 ADD LEFT TURN LANE & SHOULDERS 32,685
69 TRAVIS SH71 ADD LEFT TURN LANE & SHOULDERS 36,340
70 TRAVIS FM3177 REALIGN RDWY 13,681
71 TRAVIS LP1 ADD BICYCLE BRIDGE 3,162
72 TRAVIS IH35 CONSTRUCT NB COLLECTOR-DISTRIBUTOR 8,141
73 TRAVIS SH45 INSTALL LTL & PAVED SHOULDERS 1,791
74 TRAVIS US290 EXTENTION GREGG MANOR & RECONF SGLS 9,865
75 UPSHUR SH154 SUBGR WID, SURF, STRS, PVT MRKS 1,663
76 VICTORIA CR REPLACE BRIDGE AND APPROACHES  15
77 VICTORIA BU59T ADD TURN LANE 56
78 WILLIAMSON FM685 RECONSTRUCT TO 4-LANE DIVIDED RDWY 26,238
79 WILLIAMSON RM1431 INNOVATIVE INTERSECTION IMPROVEMNTS 14,220
80 WILIAMSON US183  CONSTRUCT DECELERATION LANE 1,475
81 WILLIAMSON FM972 REPLACE BRIDGE AND APPROACHES 408
82 WILLIAMSON US183 ADD RIGHT TURN&DUAL LEFT TURN LANES 1,114
83 WISE US81 CONSTRUCT 4 LANE GRADE SEPARATION 59,836
84 WISE FM920 GR,BS AND PAVEMENT 127
85 WISE FM718
40,233








TOTALS SCHEDULED FOR AUGUST 1,304,080

 