The TxDOT highway letting is scheduled for August July 9th and 10th. The total tonnage of asphalt pavements being let is 1,304,080.
# | COUNTY | HWY |
TYPE | TONS |
1 | ARCHER | US277 | WIDEN NON-FREEWAY | 35,022 |
2 | BASTROP | US290 | WIDEN GR STRS BS & SURF | 148,773 |
3 | BLANCO | US281 | UPGRADE TO SUPER 2 | 29,636 |
4 | BRAZORIA | CR | GR, STRS, BASE AND PAVE | 13,703 |
5 | BRAZOS | FM974 | ROADWAY RESTORATION | 849 |
6 | CALDWELL | US183 | RECONSTRUCT TO 5-LN URBAN SECTION | 32,193 |
7 | DALLAM | SS24 | NEW LOCATION 2 LANE RDWY | 5,661 |
8 | DALLAS | IH35E | FULL DEPTH REPAIR | 1,223 |
9 | DALLAS | FM1382 | INTERSECTION IMPROVE | 1,870 |
10 |
DAWSON | SH349 | GR, BASE, ACP, STR | 1,249 |
11 |
DENTON | US377 | REHAB AND WIDEN BRIDGE AND APPROACH | 5,341 |
12 |
DEWITT | SH72 | RESTORATION OF EXISTING ROADWAY | 5,713 |
13 | ECTOR | US385 | INTERSECT IMPROVE | 2,104 |
14 | EL PASO | IH10 | INTERCHANGE IMPROVE | 34,513 |
15 |
EL PASO | SH20 | ROADWAY IMPROVEMENT | 10,380 |
16 | EL PASO | US62 | WIDEN ROADWAY FROM 4 TO 6 LANE | 3,735 |
17 | EL PASO | SH20 | INTERSECT IMPROVE | 19 |
18 | EL PASO | FH258 | REPLACE STRUCTURE | 362 |
19 | EL PASO | CS | PASEO DEL NORTE IMPROVEMENTS | 460 |
20 | ERATH | US67 | GRADING, DRAINAGE, STRUCTURES & PAV | 53,165 |
21 |
FT. BEND | CR | REPLACE BRIDGE AND APPROACHES | 96 |
22 |
FT. BEND | SP10 | GR, STRS, BASE & SURF | 16,408 |
23 |
GALVESTON | FM2004 | INTERSECT IMPROVE | 8,832 |
24 |
GALVESTON | FM518 | MANAGEMENT IMPROVE | 4 |
25 |
GRAYSON | US75 | MISC CONSTRUCTION | 1,242 |
26 |
GRAYSON | US75 | REHABILITATION OF EXISTING ROADWAY | 18,284 |
27 |
GREGG | FM349 | GRD,CMT TRT SBGR,FLX BS,OCST,STRS | 1,749 |
28 |
GREGG | US259 | SBG WDN,HMAC BS&SURF,OCST,MBGF,SIGN | 2,187 |
29 |
GREGG | FM2275 | GR,STRS,ACP BS&SURF,CONC PVT,OCST | 35,947 |
30 |
HARRIS | BF1960 | BS REP, MILL, SC INTERLAYER, OL | 29,946 |
31 |
HARRIS | FM865 | GR, BS & SURF | 3,120 |
32 |
HARRIS | VA | PED & SIG IMPRVMTS IN AIRLINE DIST | 811 |
33 | HARRIS | IH610 | ACP O/L | 3,719 |
34 |
HARRIS | SH3 | ADD RT LN, RR WORK, W/SIGNALS | 3,192 |
35 |
HARRIS | CR | REPLACE BRIDGE | 753 |
36 | HARTLEY | US54 | REPLACE BRIDGE & APPR | 748 |
37 |
HAYS | IH35 | WDN XSTING BRG &ADD TURNAROUND BRGS | 20,277 |
38 | HAYS | FM2439 | ADD CENTER TURN LANE | 11,429 |
39 | HAYS | IH35 | REPLACE BRIDGE | 13,061 |
40 | HAYS | SH80 | INTERSECTION IMPROVE | 12,863 |
41 | HAYS | RM12 | INSTALL CENTER TURN LANE & SHLDRS | 6,249 |
42 | HIDALGO | FM494 | SIGNAL RETIMING & ADD LANES @ US 83 | 1,294 |
43 | JOHNSON | CR | GR, BS, STRUCTURE | 125 |
44 | JOHNSON | SH174 | GR, BS, PAVEMENT AND SIGNAL | 95 |
45 | KARNES | SH72 | GRADE,BASE,SURF,STRS | 130,297 |
46 | LEE | US290 | WIDEN ROADWAY TO ADD TURN LANE | 8,333 |
47 | LIBERTY | FM1413 | GR, BS, STR, PVT. | 6,338 |
48 | LIBERTY | FM787 | REPLACE BRIDGE AND APPROACHES | 153 |
49 | MENARD | US83 | ADD PASSING LANES | 18,241 |
50 | MONTGMERY | LP336 | WIDEN TO 4 LANES | 2,767 |
51 | NAVARRO | SH14 | REPLACE EXISTING RAILROAD UNDERPASS | 5,263 |
52 | NEWTON | FM1013 | EDGE STABILIZATION | 1,635 |
53 | NUECES | FM361 | GRD,BASE,STRS,STORM SEWER,C &G,SIDE | 22,480 |
54 | NUECES | FM2444 | GRADE, BASE, SURF,STRTS | 63,214 |
55 | NUECES | VA | INTERSECTION IMPROVE | 47,680 |
56 | NUECES | VA | INTERSECTION IMPROVE | 9,022 |
57 | PANOLA | FM3324 | GR,BS, DR, STRUC AND PAVEMENT | 4,324 |
58 | RANDALL | LP335 | ADDITIONAL 2 LANES AND BRIDGES | 66,380 |
59 | ROBERTSON | SH7 | MILL AND INLAY HMA | 5,022 |
60 | ROCKWALL | FM740 | GRADING,STRUCTURES,DRAINAGE, & PVMT | 27,780 |
61 | SAN PATCIO | SH361 | MILL & OVERLAY | 5,480 |
62 | SAN PATCIO | FM1068 | WIDEN ROADWAY | 3,795 |
63 | TARRANT | FM1220 | GRADING, BASE AND PAVEMENT | 34,834 |
64 | TARRANT | CS | REPLACE BRIDGE | 10,179 |
65 | TARRANT | CS | INTERSECTION IMPROVE | 516 |
66 | TARRANT | SH26 | CROSSWALKS,ADA RAMPS & IMPROVEMENT | 71 |
67 | TARRANT | FM156 | GR, BS, AND PAVEMENT | 824 |
68 | TRAVIS | SH71 | ADD LEFT TURN LANE & SHOULDERS | 32,685 |
69 | TRAVIS | SH71 | ADD LEFT TURN LANE & SHOULDERS | 36,340 |
70 | TRAVIS | FM3177 | REALIGN RDWY | 13,681 |
71 | TRAVIS | LP1 | ADD BICYCLE BRIDGE | 3,162 |
72 | TRAVIS | IH35 | CONSTRUCT NB COLLECTOR-DISTRIBUTOR | 8,141 |
73 | TRAVIS | SH45 | INSTALL LTL & PAVED SHOULDERS | 1,791 |
74 | TRAVIS | US290 | EXTENTION GREGG MANOR & RECONF SGLS | 9,865 |
75 | UPSHUR | SH154 | SUBGR WID, SURF, STRS, PVT MRKS | 1,663 |
76 | VICTORIA | CR | REPLACE BRIDGE AND APPROACHES | 15 |
77 | VICTORIA | BU59T | ADD TURN LANE | 56 |
78 | WILLIAMSON | FM685 | RECONSTRUCT TO 4-LANE DIVIDED RDWY | 26,238 |
79 | WILLIAMSON | RM1431 | INNOVATIVE INTERSECTION IMPROVEMNTS | 14,220 |
80 | WILIAMSON | US183 | CONSTRUCT DECELERATION LANE | 1,475 |
81 | WILLIAMSON | FM972 | REPLACE BRIDGE AND APPROACHES | 408 |
82 | WILLIAMSON | US183 | ADD RIGHT TURN&DUAL LEFT TURN LANES | 1,114 |
83 | WISE | US81 | CONSTRUCT 4 LANE GRADE SEPARATION | 59,836 |
84 | WISE | FM920 | GR,BS AND PAVEMENT | 127 |
85 | WISE | FM718 | 40,233 | |
TOTALS SCHEDULED FOR AUGUST | 1,304,080 |