TxDOT – August 2012 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for August 7th & 8th. The total tonnage of asphalt pavements being let is 1,454,971.86.
| # |
COUNTY |
HWY |
TYPE |
TONS |
| 1 |
AUSTIN |
SH 36 |
CONSTRUCT AUXILIARY LANES |
120,924.00 |
| 2 |
BEXAR |
IH 410 |
RELOCATE ENTRANCE & EXIT RAMPS BETWEEN RR OVERPASS |
5,277.00 |
| 3 |
BRAZORIA |
CR |
RECONSTRUCT 2 LN RDWAY |
17,717.00 |
| 4 |
BRAZORIA |
SH 35 |
BASE REPAIR AND INLAY |
2,054.00 |
| 5 |
BRAZOS |
SH 21 |
WIDEN NON-FREEWAY FACILITY |
59,340.80 |
| 6 |
BRAZOS |
FM 2818 |
OVERLAY |
7,294.00 |
7
|
BROOKS |
US 281 |
CONSTRUCT OVERPASS |
33,052.00 |
8
|
CALHOUN |
FM 1289 |
SET FIXED OBJECTS AND CONSTRUCT SHOULDERS |
318.00 |
9
|
CAMERON |
US 77 |
UPGD RMPS & CNVRT FR RDS TO 1-WAY |
19,898.00 |
10
|
COLLIN |
US 75 |
RECONSTRUCT AND WIDEN 4 LANE TO 6 LANES |
106,180.00 |
| 11 |
COLLINGSWORTH |
SH 203 |
REHABILITATION OF A BRIDGE FACILITY |
102.00 |
| 12 |
COMAL |
BS 46-C |
REPLACE RR UNDERPASS & WIDEN TO 4 LANE UNDIVIDED |
8,029.00 |
| 13 |
COMAL |
FM 306 |
EXPAND 2 TO 4 LANE DIVIDED |
78,533.00 |
| 14 |
COMAL |
FM 3009 |
RECONFIGURE INTERSECTION |
7,223.00 |
| 15 |
COTTLE |
FM 1037 |
WIDENING OF NON FREEWAY FACILITY |
1,515.00 |
| 16 |
DALLAS |
IH 35E |
GENERAL ROUTINE MAINTENANCE |
8,750.00 |
| 17 |
DALLAS |
IH 35E |
FULL DEPTH REPAIR OF FRONTAGE ROADS AND RAMPS |
65.00 |
| 18 |
DALLAS |
IH 45 |
FULL DEPTH REPAIR OF FRONTAGE ROADS AND RAMPS |
22,000.00 |
| 19 |
DENTON |
FM 407 |
GENERAL ROUTINE MAINTENANCE |
815.00 |
20
|
DIMMIT, ETC |
US 83 |
GRADE, BASE, SURF, STR, STRIP & SIGN |
51,628.00 |
21
|
EL PASO |
IH 10 |
CONSTRUCT RAMPS ON I-10 NORTH |
3,876.00 |
22
|
EL PASO |
SP 276 |
GRADE,STRUCT,SIGN,DELIN,ACP |
18,342.00 |
| 23 |
ELLIS |
FM 85 |
BASE REPAIR |
3,000.00 |
| 24 |
ERATH |
SH 267 |
RECONSTRUCT US 67 0N ALT. RT N & W OF DUBLIN |
50,693.00 |
| 25 |
FANNIN |
SH 121 |
UPGRADE TO 5 LANE ROADWAY WITH SHOULDERS |
27,775.00 |
| 26 |
FREESTONE |
FM 1365 |
ROADWAY RESTORATION |
4,574.00 |
| 27 |
GONZALES |
UA 90 |
ACP OVERLAY |
29,993.00 |
| 28 |
GRAYSON, ETC |
US 82 |
WIDEN FROM 2-LANE TO 4-LANE DIVIDED |
153,137.00 |
| 29 |
GUADALUPE, ETC |
IH 35 |
GR, BS, STR, SURF, OVERLAY |
110,066.00 |
30
|
GUADALUPE, ETC |
SH 123 |
WIDEN ROADWAY TO PROVIDE PASSING LANES |
46,272.00 |
| 31 |
HARRIS |
BU-90 |
REPLACE BRIDGE AND APPROACHES. |
1,456.00 |
| 32 |
HARRIS |
SH 225 |
FULL DEPTH REPAIR, MILLING, CURB REPAIR & ACP O/L |
12,623.05 |
| 33 |
HARRIS |
SH 288 |
CONSTRUCT TWO LANE DIRECT CONNECTOR |
428.00 |
| 34 |
HARRIS |
FM 529 |
GR, STRS, BASE AND SURF |
11,076.40 |
| 35 |
HARRIS |
FM 1960 |
TRAFFIC SIGNAL |
1,379.50 |
| 36 |
HARRIS |
FM 1942 |
INST. LFT TURN LN. ON FM 1942 EB TO BOHEMIAN RD. |
1,207.37 |
| 37 |
HARRIS |
IH 10 |
INTERSECTION IMPROVEMENTS |
5,354.00 |
| 38 |
HARTLEY, ETC |
US 87 |
REHAB EXIST LANES & PASSING LANES
|
134,143.00 |
| 39 |
HAYS |
LP 82 |
REPLACE BRIDGE CLASS CULVERT |
640.00 |
| 40 |
HAYS |
RM 12 |
INTERSECTION IMPROVEMENTS |
853.00 |
| 41 |
HENDERSON |
SH 19 |
WIDEN 2 LN ROADWAY TO SUPER-2 (3-LANE) CRITERIA |
23,253.00 |
| 42 |
HIDALGO |
FM 1926 |
CONST RIGHT TURN LANES (NB & WB) |
178.70 |
| 43 |
HIDALGO |
US 281 |
RECONST MAIN LANES AND ADD FRONTAGE ROADS |
62,120.00 |
| 44 |
HOOD |
US 377 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR |
3,000.00 |
| 45 |
JOHNSON |
SH 174 |
ASPHALT & INLAY, C.MEDIAN, MAIN LANES & SHLDRS |
20,548.00 |
| 46 |
JOHNSON |
IH 35W |
MILL AND HMAC OVERLAY |
52,881.00 |
| 47 |
JOHNSON |
FM 2135 |
ADD PAVED SURFACE WIDTH,2'SHOULDERS,OVERLAY |
24,760.00 |
| 48 |
KAUFMAN |
SH 34 |
REMOVE & REPLACE RIPRAP & WINGWALL |
3.30 |
| 49 |
KERR |
SH 39 |
UPGRADE TO 2 LANE WITH CONTIUOUS LEFT TURN LANE |
12,523.28 |
| 50 |
KNOX |
SH 6 |
REPLACEMENT OF AN EXISTING BRIDGE FACILITY |
8,972.46 |
| 51 |
LAMAR |
US 271 |
REHABILITATION OF EXISTING ROAD |
22,385.00 |
| 52 |
LASALLE, ETC |
SH 97, ETC |
OVERLAY |
50,251.00 |
| 53 |
LIVE OAK, ETC |
FM 624 |
GRADE,BASE,SURF,STRS |
908.00 |
| 54 |
MEDINA |
SH 173 |
REHAB & WIDEN NARROW PVMT TO ADD SHOULDERS |
5,585.00 |
| 55 |
MILAM |
FM 486 |
GR, STRS, BASE AND SURFACE |
76.30 |
| 56 |
MONTGOMERY |
CS |
GR, STRS, BASE AND PAVE |
613.00 |
| 57 |
MONTGOMERY, ETC |
FM 2978, ETC |
GR, STRS, BASE AND PAVE |
2,039.00 |
| 58 |
MOTLEY |
FM 94 |
NEW BASE, ACP AND STRUCTURES |
13,682.00 |
| 59 |
NACOGDOCHES |
SH 7 |
REHAB EXISTING RDWY & ADD PV SHLDRS/PASSING LANES |
49,440 |
| 60 |
NUECES |
SH 357 |
MILL, UNDERSEAL AND INLAY |
730.00 |
| 61 |
PARKER |
FM 1884 |
WIDEN EXISTING RDWAY ADD SHOULDERS |
25,744.00 |
| 62 |
RED RIVER |
FM 411 |
BASE REHABILITATION |
148.00 |
| 63 |
RED RIVER |
SH 37 |
REPLACE BRIDGE |
14,289.00 |
| 64 |
ROCKWALL |
SH 205 |
REPLACE BRIDGES AND APPROACHES |
1,185.00 |
| 65 |
ROCKWALL |
FM 550 |
REPLACE BRIDGES AND APPROACHES |
4,053.00 |
| 66 |
SAN PATRICIO |
FM 3239, ETC |
DRADE, BASE, SURF & STRTS |
10,607.00 |
| 67 |
SHELB |
US 84 |
RECONSTRUCT EXISTING PAVEMENT |
36,395.00 |
| 68 |
STARR |
FM 755 |
OVERLAY |
30,810.21 |
| 69 |
TARRANT |
FM 730 |
MILL & OVERLAY |
17,683.00 |
| 70 |
TOM GREEN |
US 67 |
REPLACE BRIDGES |
3,160.00 |
| 71 |
TRAVIS |
LP 1 |
WIDEN NBFR & INSTALL AUXILIARY LANE |
1,116.00 |
| 72 |
UVALDE |
FM 1049 |
REHAB AND WIDEN NARROW ROADWAY TO ADD SHOULDERS |
80.00 |
| 73 |
VAN ZANDT |
SH 64 |
WIDEN 2-LN ROADWAY TO SUPER-2 (3-LN) CRITERIA
|
32,457.00 |
| 74 |
WALKER |
SH 75 |
UPGRADE INTERCHANGE TO STANDARDS |
15,485.00 |
| 75 |
WALLER |
FM 362, ETC |
INSTALL LEFT TURN LANES |
2,738.50 |
| 76 |
WEBB |
SL 20 |
GRADING,BASE,STRUCTURES,& SURFACE |
15,898.00 |
| 77 |
WILBARGER |
FM 3207 |
PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
15,096.00 |
| 78 |
WOOD |
SH 154 |
REPLACE BRIDGE & APPROACHES |
5,134.00 |
|
|
|
|
|
|
TOTAL |
|
|
1,454,971.86 |
|
|