TxDOT – May 2012 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for May 2nd & 3rd. The total tonnage of hot mix being let is 695,946.
# |
COUNTY |
HWY
|
TYPE |
TONS |
1 |
ANGELINA
|
SH0063
|
METAL BEAM GUARD FENCE UPGRADE |
1,073 |
2 |
ARMSTRONG
|
US 287
|
REHAB EXISTING ROADWAY |
61,203 |
3 |
AUSTIN
|
CR
|
REPLACE BRIDGE & APPROACHES |
207 |
4 |
BASTROP
|
SH 21
|
MILL, SEAL & OVERLAY |
11,160 |
5 |
BASTROP
|
FM 1100
|
CONST SIDEWALKS & CROSSWALKS |
86 |
6 |
BASTROP
|
FM 20, ETC.
|
WDN, RE-ALIGN VERT, TWLTL, CULV, OV |
15,620 |
7 |
BEXAR
|
VA
|
CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE |
164 |
8 |
BLANCO
|
RM 165
|
ADD PVD SRF WDTH, GRDRL & SFT TRT FIXED OBJECTS |
13,809 |
9 |
BRAZORIA
|
SH0288
|
COPING & SLOPE REPAIR |
104 |
10 |
BRAZOS
|
BS6-R, ETC.
|
OVERLAY |
17,098 |
11 |
BRAZOS
|
SH 6 |
IMPROVE TRAFFIC SIGNALS |
60 |
12 |
BRAZOS
|
FM 1179
|
GR, STRUCT, WIDEN PAV, SIDEWALKS |
8,161 |
13 |
BRAZOS
|
SH0006
|
HMA MILL & INLAY |
1,010 |
14 |
BRAZOS
|
FM 60
|
GRADING, STRUCTURES, BASE & SURFACE |
17,914 |
15 |
BROWN
|
VA
|
ADA CURB RAMPS |
300 |
16 |
BURNET
|
RM0963
|
DRAINAGE CONSTRUCTION |
9 |
17 |
CALHOUN
|
FM 1289
|
REPLACE BRIDGE & APPROACHES |
313 |
18 |
COLLIN
|
FM 1827
|
PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
4,100 |
19
|
COMAL
|
US 281
|
EXPAND 2 LANES TO 4 LANES DIVIDED RURAL |
55,481 |
20
|
CORYELL
|
SH0036
|
PAVEMENT REPAIR |
9,532 |
21
|
DALLAS
|
IH0035E
|
GENERAL ROUTINE MAINTENANCE |
28,832 |
22 |
DALLAS
|
IH 20 |
CONSTR 2 NEW RAMPS CONNECT IH 20 WITH KLEBERG |
6,918 |
23 |
DALLAS
|
IH0045 |
GENERAL ROUTINE MAINTENANCE |
27,951 |
24 |
DEWITT
|
VA |
CONSTRUCT CURB RAMPS |
100 |
25 |
DEWITT
|
VA |
CONSTRUCT CURB RAMPS |
150 |
26 |
EL PASO
|
IH0010 |
ROADWAY REPAIRS |
5,060 |
27 |
EL PASO
|
RM2775 |
PAVEMENT REPAIR |
9,300 |
28 |
FORT BEND
|
SH 36 |
WDN RDY W/ O/L & PV MKS |
51,644 |
29
|
GALVESTON
|
SH 6 |
BS REPR, SC & ACP OVERLAY |
18,872 |
30
|
GILLESPIE
|
US 290 |
ADD TWO WAY LEFT TURN LANE |
18,553 |
31 |
GILLESPIE
|
US 290 |
INSTALL CENTER TURN LANE & WIDEN PAVED SHOULDERS |
3,391 |
32 |
GONZALES
|
CR |
REPLACE BRIDGE & APPROACHES |
9 |
33 |
GRAYSON
|
PW |
REPAIR PAVEMENT & OVERLAY, CONSTRUCT 2ND ENTRY |
436 |
34 |
GRAYSON
|
FM 131 |
REHABILITATION OF EXISTING ROADWAY
|
250 |
35 |
GRAYSON
|
SH 289 |
ADD SHOULDERS |
1,351 |
36 |
GRAYSON
|
SH0056 |
ON CALL MILL & INLAY |
1,980 |
37 |
GRAYSON
|
SH0056 |
ON CALL HOT-MIX OVERLAY |
2,500 |
38 |
GREGG
|
IH 20 |
OCST, PFC SURFACE & PAVEMENT MARKINGS |
10,291 |
39
|
GRIMES
|
SH 90 |
REHABILITATE EXISTING ROAD |
7,628 |
40 |
HARRIS
|
VA |
CONSTRUCT CURB RAMPS |
43 |
41 |
HAYS
|
RM 150 |
ROADWAY REALIGNMENT |
7,125 |
42 |
HAYS
|
IH 35 |
CONST SB FRONTAGE RD |
24,364 |
43 |
HIDALGO
|
CS |
ADD LEFT TURN CENTER LANE & UTILITY ADJUSTMENTS |
3,938 |
44 |
HILL
|
IH0035 |
RECONSTRUCTION OF CURVES |
9,491 |
45 |
JEFFERSON
|
SH 347 |
REHABILITATE EXISTING ROADWAY |
8,384 |
46 |
JEFFERSON
|
IH 10, ETC. |
REPAIR EXISTING PAVEMENT & OVERLAY ROADWAY |
9,100 |
47 |
JIM WELLS
|
FM 1352 |
MILL, SEAL & OVERLAY |
3,191 |
48 |
JIM WELLS
|
FM2295 |
HMACP OVERLAY |
19,714 |
49
|
JOHNSON |
FM 2738 |
REPLACE BRIDGE & APPROACHES |
303 |
50 |
KLEBERG |
RM 628 |
WIDEN ROADWAY |
26 |
51 |
LAMPASAS |
SL 257 |
GRADING, PAVEMENT, C&G, STORM DRAIN, ILLUM |
7,098 |
52
|
MATAGORDA |
FM 521 |
REPLACE BRIDGES & APPROACHES |
3,449 |
53
|
MATAGORDA |
FM 521 |
REPLACE BRIDGES & APPROACHES |
3,578 |
54
|
MAVERICK |
FM 1021 |
CONSTRUCT RR GRADE SEP, STR & APPR |
5,446 |
55
|
MONTGOMERY
|
SH 105
|
INSTALL LEFT TURN LANES
|
11,424
|
56
|
MONTGOMERY |
FM 1774
|
ACP OVERLAY |
10,294 |
57
|
MONTGOMERY |
CR |
REPLACE BRIDGE & APPROACHES |
872 |
58
|
MONTGOMERY, ETC. |
FM 2978 |
GR, STRS, BASE & PAVE |
1,520 |
59
|
NEWTON |
FM 363 |
RAISE ROADWAY & REPLACE BRIDGE |
1,700 |
60
|
NUECES |
FM 3386 |
CONSTRUCT NEW FM ROAD |
10,890 |
61
|
NUECES |
US 77 |
MILL & INLAY |
1,369 |
62
|
NUECES |
MR 670 |
LOADING FACILITY & PARKING LOT |
234 |
63
|
PARKER |
US 180 |
GR, BS, STRUCTURES & PAVEMENT |
2,080 |
64
|
PARKER |
SH 199 |
HOTMIX OVERLAY |
54,675 |
65
|
PARKER |
CR |
REPLACE BRIDGE & APPROACHES |
216 |
66
|
PARKER |
FM 1187 |
WIDEN FROM 2 LNS TO 4 LNS WITH RAISED MEDIAN |
25,182 |
67
|
POLK |
US 190 |
IMPROVE TRAFFIC SIGNAL & LENGTHEN TURN LANES |
2,335 |
68
|
POLK |
CR |
REPLACE BRIDGE & APPROACHES |
308 |
69
|
RANDALL
|
CR |
REHABILITATION EXISTING ROAD |
1,952 |
70
|
RANDALL
|
US 60 |
REPLACE BRIDGE AND APPROACH |
179 |
71
|
SAN PATRICIO
|
US 181 |
SEAL & OVERLAY |
7,690 |
72
|
SMITH
|
FM 14 |
SBGR WDN, BS, OCST, HMAC SURF, STRS & PV MK |
18,515 |
73 |
TITUS |
CR |
REPLACE BRIDGES & APPROACHES
|
480 |
74
|
TRAVIS
|
RM2222 |
SPOT REPAIRS, UNDERSEAL & OVERLAY |
12,784 |
75
|
TRAVIS
|
RM1431 |
REMOVE CATTLE GUARD & CULVERT EXT. |
9 |
76 |
TRAVIS |
FM 685
|
MILL, SEAL & OVERLAY
|
5,107 |
77
|
WASHINGTON
|
US 290 |
INSTALL MEDIAN BARRIER |
17 |
78
|
WEBB
|
VA |
CONSTRUCT CURB RAMPS |
34 |
79
|
WILLIAMSON
|
FM 3405
|
BASE REPAIR & OVERLAY |
8202 |
80
|
ZAVALA
|
FM0017
|
BRIDGE REHAB/PARTIAL CONCRETE CULVERT BO |
8 |
|
|
|
|
|
|
TOTAL
|
|
|
695,946
|
|
|