The TxDOT highway letting is scheduled for May 2nd & 3rd. The total tonnage of hot mix being let is 695,946.
# | COUNTY | HWY |
TYPE | TONS |
1 | ANGELINA |
SH0063 |
METAL BEAM GUARD FENCE UPGRADE | 1,073 |
2 | ARMSTRONG |
US 287 |
REHAB EXISTING ROADWAY | 61,203 |
3 | AUSTIN |
CR |
REPLACE BRIDGE & APPROACHES | 207 |
4 | BASTROP |
SH 21 |
MILL, SEAL & OVERLAY | 11,160 |
5 | BASTROP |
FM 1100 |
CONST SIDEWALKS & CROSSWALKS | 86 |
6 | BASTROP |
FM 20, ETC. |
WDN, RE-ALIGN VERT, TWLTL, CULV, OV | 15,620 |
7 | BEXAR |
VA |
CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE | 164 |
8 | BLANCO |
RM 165 |
ADD PVD SRF WDTH, GRDRL & SFT TRT FIXED OBJECTS | 13,809 |
9 | BRAZORIA |
SH0288 |
COPING & SLOPE REPAIR | 104 |
10 | BRAZOS |
BS6-R, ETC. |
OVERLAY | 17,098 |
11 | BRAZOS |
SH 6 | IMPROVE TRAFFIC SIGNALS | 60 |
12 | BRAZOS |
FM 1179 |
GR, STRUCT, WIDEN PAV, SIDEWALKS | 8,161 |
13 | BRAZOS |
SH0006 |
HMA MILL & INLAY | 1,010 |
14 | BRAZOS |
FM 60 |
GRADING, STRUCTURES, BASE & SURFACE | 17,914 |
15 | BROWN |
VA |
ADA CURB RAMPS | 300 |
16 | BURNET |
RM0963 |
DRAINAGE CONSTRUCTION | 9 |
17 | CALHOUN |
FM 1289 |
REPLACE BRIDGE & APPROACHES | 313 |
18 | COLLIN |
FM 1827 |
PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 4,100 |
19 |
COMAL |
US 281 |
EXPAND 2 LANES TO 4 LANES DIVIDED RURAL | 55,481 |
20 |
CORYELL |
SH0036 |
PAVEMENT REPAIR | 9,532 |
21 |
DALLAS |
IH0035E |
GENERAL ROUTINE MAINTENANCE | 28,832 |
22 | DALLAS |
IH 20 | CONSTR 2 NEW RAMPS CONNECT IH 20 WITH KLEBERG | 6,918 |
23 | DALLAS |
IH0045 | GENERAL ROUTINE MAINTENANCE | 27,951 |
24 | DEWITT |
VA | CONSTRUCT CURB RAMPS | 100 |
25 | DEWITT |
VA | CONSTRUCT CURB RAMPS | 150 |
26 | EL PASO |
IH0010 | ROADWAY REPAIRS | 5,060 |
27 | EL PASO |
RM2775 | PAVEMENT REPAIR | 9,300 |
28 | FORT BEND |
SH 36 | WDN RDY W/ O/L & PV MKS | 51,644 |
29 |
GALVESTON |
SH 6 | BS REPR, SC & ACP OVERLAY | 18,872 |
30 |
GILLESPIE |
US 290 | ADD TWO WAY LEFT TURN LANE | 18,553 |
31 | GILLESPIE |
US 290 | INSTALL CENTER TURN LANE & WIDEN PAVED SHOULDERS | 3,391 |
32 | GONZALES |
CR | REPLACE BRIDGE & APPROACHES | 9 |
33 | GRAYSON |
PW | REPAIR PAVEMENT & OVERLAY, CONSTRUCT 2ND ENTRY | 436 |
34 | GRAYSON |
FM 131 | REHABILITATION OF EXISTING ROADWAY |
250 |
35 | GRAYSON |
SH 289 | ADD SHOULDERS | 1,351 |
36 | GRAYSON |
SH0056 | ON CALL MILL & INLAY | 1,980 |
37 | GRAYSON |
SH0056 | ON CALL HOT-MIX OVERLAY | 2,500 |
38 | GREGG |
IH 20 | OCST, PFC SURFACE & PAVEMENT MARKINGS | 10,291 |
39 |
GRIMES |
SH 90 | REHABILITATE EXISTING ROAD | 7,628 |
40 | HARRIS |
VA | CONSTRUCT CURB RAMPS | 43 |
41 | HAYS |
RM 150 | ROADWAY REALIGNMENT | 7,125 |
42 | HAYS |
IH 35 | CONST SB FRONTAGE RD | 24,364 |
43 | HIDALGO |
CS | ADD LEFT TURN CENTER LANE & UTILITY ADJUSTMENTS | 3,938 |
44 | HILL |
IH0035 | RECONSTRUCTION OF CURVES | 9,491 |
45 | JEFFERSON |
SH 347 | REHABILITATE EXISTING ROADWAY | 8,384 |
46 | JEFFERSON |
IH 10, ETC. | REPAIR EXISTING PAVEMENT & OVERLAY ROADWAY | 9,100 |
47 | JIM WELLS |
FM 1352 | MILL, SEAL & OVERLAY | 3,191 |
48 | JIM WELLS |
FM2295 | HMACP OVERLAY | 19,714 |
49 |
JOHNSON | FM 2738 | REPLACE BRIDGE & APPROACHES | 303 |
50 | KLEBERG | RM 628 | WIDEN ROADWAY | 26 |
51 | LAMPASAS | SL 257 | GRADING, PAVEMENT, C&G, STORM DRAIN, ILLUM | 7,098 |
52 |
MATAGORDA | FM 521 | REPLACE BRIDGES & APPROACHES | 3,449 |
53 |
MATAGORDA | FM 521 | REPLACE BRIDGES & APPROACHES | 3,578 |
54 |
MAVERICK | FM 1021 | CONSTRUCT RR GRADE SEP, STR & APPR | 5,446 |
55 |
MONTGOMERY |
SH 105 |
INSTALL LEFT TURN LANES |
11,424 |
56 |
MONTGOMERY | FM 1774 |
ACP OVERLAY | 10,294 |
57 |
MONTGOMERY | CR | REPLACE BRIDGE & APPROACHES | 872 |
58 |
MONTGOMERY, ETC. | FM 2978 | GR, STRS, BASE & PAVE | 1,520 |
59 |
NEWTON | FM 363 | RAISE ROADWAY & REPLACE BRIDGE | 1,700 |
60 |
NUECES | FM 3386 | CONSTRUCT NEW FM ROAD | 10,890 |
61 |
NUECES | US 77 | MILL & INLAY | 1,369 |
62 |
NUECES | MR 670 | LOADING FACILITY & PARKING LOT | 234 |
63 |
PARKER | US 180 | GR, BS, STRUCTURES & PAVEMENT | 2,080 |
64 |
PARKER | SH 199 | HOTMIX OVERLAY | 54,675 |
65 |
PARKER | CR | REPLACE BRIDGE & APPROACHES | 216 |
66 |
PARKER | FM 1187 | WIDEN FROM 2 LNS TO 4 LNS WITH RAISED MEDIAN | 25,182 |
67 |
POLK | US 190 | IMPROVE TRAFFIC SIGNAL & LENGTHEN TURN LANES | 2,335 |
68 |
POLK | CR | REPLACE BRIDGE & APPROACHES | 308 |
69 |
RANDALL |
CR | REHABILITATION EXISTING ROAD | 1,952 |
70 |
RANDALL |
US 60 | REPLACE BRIDGE AND APPROACH | 179 |
71 |
SAN PATRICIO |
US 181 | SEAL & OVERLAY | 7,690 |
72 |
SMITH |
FM 14 | SBGR WDN, BS, OCST, HMAC SURF, STRS & PV MK | 18,515 |
73 | TITUS | CR | REPLACE BRIDGES & APPROACHES |
480 |
74 |
TRAVIS |
RM2222 | SPOT REPAIRS, UNDERSEAL & OVERLAY | 12,784 |
75 |
TRAVIS |
RM1431 | REMOVE CATTLE GUARD & CULVERT EXT. | 9 |
76 | TRAVIS | FM 685 |
MILL, SEAL & OVERLAY |
5,107 |
77 |
WASHINGTON |
US 290 | INSTALL MEDIAN BARRIER | 17 |
78 |
WEBB |
VA | CONSTRUCT CURB RAMPS | 34 |
79 |
WILLIAMSON |
FM 3405 |
BASE REPAIR & OVERLAY | 8202 |
80 |
ZAVALA |
FM0017 |
BRIDGE REHAB/PARTIAL CONCRETE CULVERT BO | 8 |
TOTAL |
695,946 |