| # | COUNTY | HWY | TYPE | TONS |
| 1 | ANGELINA | US 69 | SAFETY TREAT FIXED OBJECTS | 277 |
| 2 | ARANSAS | BS 35L | MILL, SEAL & OVERLAY | 5,670 |
| 3 | ARCHER | US 82 | OVERLAY | 42,529 |
| 4 | BEE | US 181 | MILL, SEAL & OVERLAY | 11,511 |
| 5 | BEXAR | MR 681 | MAINTENANCE EXISTING ROADS AND PARKING | 429 |
| 6 | BLANCO | US 281 | LEVEL UP, SEAL, THIN OVERLAY | 6,309 |
| 7 | BURLESON | FM 60 | OVERLAY | 19,986 |
| 8 | CAMERON | US 281 | CONSTRUCT RURAL 4 LANE | 37,334 |
| 9 | CAMERON | SH 100 | NSTALL WILDLIFE CROSSINGS | 1,539 |
| 10 | CLAY | US 82 | UPGRADE BRIDGE AND APPROACH RAILING | 26,729 |
| 11 | COLLIN | SH 21 | GRADE SEPARATION | 36,519 |
| 12 | COLORADO | SH 71 | CONSTRUCT SUPER 2 LANES | 65,579 |
| 13 | CULBERSON | IH 10 | MILL AND INLAY | 101,633 |
| 14 | DENTON | US 377 | FULL DEPTH CONCRETE REPAIR | 7,282 |
| 15 | DIMMITT | US 277 | PLANING, ACP, OVERLAY PAV MRK | 70,601 |
| 16 | DUVAL | SH 359 | ACP, OVERLAY PAV MRK | 72,710 |
| 17 | EASTLAND | FM 2731 | REPLACE CULVERTS | 5 |
| 18 | ECTOR | SH 191 | RAMP IMPROVEMENTS | 4,881 |
| 19 | EL PASO | CS | OFF-SYSTEM BRIDGE REPLACEMENT | 686 |
| 20 | FAYETTE | US 90 | SAFETY TREAT FIXED OBJECTS | 230 |
| 21 | FRANKLIN | SH 37 | RECONST & ADD 10' SHLDRS | 50,992 |
| 22 | FREESTONE | CR | REPLACE EXISTING BRIDGE | 23 |
| 23 | GALVESTON | FM 517 | BS REP, SC, ACP O/L AND PV MKS | 18,259 |
| 24 | GRAYSON | BU 377 | LANDSCAPE DEVELOPMENT | 25 |
| 25 | HARRISON | US 59 | CALLOUT CONCRETE PAVEMENT REPAIR | 200 |
| 26 | HARTLEY | US 385 | OVERLAY | 59,211 |
| 27 | HAYS | IH 35 | MILL & INLAY FRT RDS | 5,953 |
| 28 | HIDALGO | SH 107 | REHABILITATE EXISTING ROADWAY | 11,708 |
| 29 | HOPKINS | SH 11 | HAZARD ELIMINATION & SAFETY | 10,383 |
| 30 | HOUSTON | US 287 | SAFETY TREAT FIXED OBJECTS | 389 |
| 31 | JACKSON | US 59 | ACP OVERLAY | 42,661 |
| 32 | JOHNSON | BU 67 M | MILL AND OVERLAY | 11,070 |
| 33 | JOHNSON | FM 3136 | GR, BS, DR, STR, & PAVT | 22,855 |
| 34 | JOHNSON | FM 917 | BASE REPAIR AND OVERLAY | 6,370 |
| 35 | KAUFMAN | FM 1836 | PROVIDE ADDITIONAL PAVED SURFACE | 2,177 |
| 36 | KIMBLE | US 83 | CONSTRUCT TRAFFIC SIGNALS | 3,345 |
| 37 | LAMAR | FM 906 | REHABILITATION OF EXISTING ROAD | 1,048 |
| 38 | LAVACA | FM 532 | RESTORE ROADWAY | 4,211 |
| 39 | LIMESTONE | FM 2705 | WDN, GR, BS, SURF & ADD SHLDRS | 11,766 |
| 40 | LUBBOCK | US 84 | GR,BASE,ACP,STR,OVERPASS,PAV MRK | 34,449 |
| 41 | MADISON | US 190 | OVERLAY | 8,248 |
| 42 | MARION | US 59 | BRIDGE PROTECTIVE MAINTENANCE | 77 |
| 43 | MONTGOMERY | VA | BASE REPAIR AND PAVEMENT LEVELING | 65 |
| 44 | NACOGDOCHES | SL 224 | RESURFACE WITH THIN OVERLAY MIXTURE | 4,925 |
| 45 | ORANGE | FM 105 | GR, BS, STR. PVMT | 6,429 |
| 46 | PECOS | IH 10 | GRADING,PAVING,DRAINAGE,ILLUM,PVMRK | 2,144 |
| 47 | POLK | VA | REPAIR AND RESURFACE PAVED AREAS | 1,420 |
| 48 | RED RIVER | CS | BRIDGE REPLACEMENT | 353 |
| 49 | SAN AUGUSTINE | SH 21 | REPLACE BRIDGE AND APPROACHES | 3,088 |
| 50 | TARRANT | FM 1220 | GRADING, BASE AND PAVEMENT | 35,135 |
| 51 | TARRANT | CS | GR, BS, PAVEMENT AND STRIPING | 24,937 |
| 52 | TARRANT | SS 580 | PAVT REPAIR AND OVERLAY | 20,418 |
| 53 | TARRANT | SH 360 | MILL AND OVERLAY | 750 |
| 54 | TAYLOR | US 83 | INSTALL MBGF AND PAVEMENT MARKINGS | 66 |
| 55 | TRAVIS | IH 35 | MILL, SEAL, & OVERLAY FRTG RDS | 15,614 |
| 56 | TRAVIS | IH 35 | MILL, SEAL & THIN OVERLAY FRT ROADS | 35,125 |
| 57 | TYLER | US 69 | MILL AND INLAY | 2,170 |
| 58 | VICTORIA | US 59 | DW ACP | 16,670 |
| 59 | WICHITA | US 281 | OVERLAY | 30,530 |
| 60 | WICHITA | US 287 | OVERLAY | 20,101 |
| 61 | WILLIAMSON | SH 29 | UNDERSEAL & THIN OVERLAY | 8,487 |
| 62 | WILLIAMSON | FM 734 | DEPTH REPAIR, UNDERSEAL & OV | 9,614 |
| 63 | WILLIAMSON | SH 29 | UNDERSEAL & THIN OVERLAY | 10,101 |
| 64 | WINKLER | SH 302 | PLANE, HOT MIX, AND PAV MRKS | 73,465 |
| 65 | WISE | FM 51 | HMAC OVERLAY | 25,562 |
| TOTAL TONNAGE FOR JANUARY 2016 | 1,165,028 |