The TxDOT highway letting is scheduled for August 5-6, 2014. Total tonnage of asphalt pavements being let is 1,015,394.
| # | COUNTY | HWY |
TYPE | TONS |
| 1 | ATASCOSA | SH97 | GRADE, BASE, SC, SURF, PVMT MRK | 86,690 |
| 2 | BEXAR | IH35 | GRD, BSE, SURF, PAV T MRKS & SIGNS | 10,794 |
| 3 | BEXAR | IH35 | MED BARRIER, PAV'T MRKS AND SIGNING | 3,185 |
| 4 | BEXAR | IH35 | GRD, BSE, SURF, PAV T MRKS & SIGNS | 3,062 |
| 5 | BOWIE | US259 | REPLACE BRIDGE AND APPROACHES | 4,535 |
| 6 | BRAZORIA | CS | REPLACE BRIDGE | 5 |
| 7 | BURNET | SH29 | ADD LEFT TURN LANE | 1,457 |
| 8 | CAMERON | VA | CONSTRUCT BSIF | 5,696 |
| 9 | CAMERON | FM803 | REALIGN & WIDEN TO 4 LANES | 24,654 |
| 10 |
COLLIN | FM981 | REPL BRIDGE | 2,020 |
| 11 |
DALLAS | SL12 | INTERSECTION IMPROVEMENT | 3,547 |
| 12 | DEWITT | US87 | ACP OVERLAY | 38,873 |
| 13 | EL PASO | IH10 | INTCHG IMPRV INCL CONSTR DIRECT CON | 35,652 |
| 14 |
EL PASO | IH10 | REHAB AND OPERATIONAL IMPROVEMENTS | 9,871 |
| 15 | FT. BEND | IH69 | GR, STRS, BASE, PAVE & HOV LNS | 95,436 |
| 16 | GRAYSON | US82 | OVERLAY | 8,100 |
| 17 | GRIMES | SH90 | REHABILITATE EXISTING ROAD | 14,173 |
| 18 | GRIMES | SH90 | REHABILITATE EXISTING ROAD | 20,219 |
| 19 | HARDIN | US69 | GR, BS, ACP, STRIPE | 17,290 |
| 20 |
HARRIS | BW8 | STRS, GR, BASE AND PAVEMENT | 806 |
| 21 |
HAYS | RM12 | IMPROVE/ADD SHOULDERS | 6,897 |
| 22 |
HENDERSON | US175 | RECONSTR GR, STRS, BS, SURF & PAV M | 95,312 |
| 23 |
HILL | IH35W | REHAB RDWY (MILL/INLAY) | 25,762 |
| 24 | JACK | US380 | MILL AND OVERLAY | 38,775 |
| 25 | JOHNSON | FM916 | GRADING, BASE AND PAVEMENT | 12,634 |
| 26 | LASALLE | IH35 | SMA OVERLAY AND PAVEMENT MRK | 16,744 |
| 27 | LASALLE | IH35 | BRIDGE REHABILITATION | 447 |
| 28 | LUBBOCK | US62 | GR, BASE, STR, ASB, ACP, CRCP, SS | 71,561 |
| 29 | MADISON | US190 | REHABILITATE EXISTING ROAD | 40,714 |
| 30 | MONTGOMERY | SH75 | WID SHOULDERS, BS REPR, OCST & O/L | 51,064 |
| 31 | MONTGOMERY | FM2854 | INST LT TN LN | 1,066 |
| 32 | MONTGOMERY | FM1774 | GR, STRS, BS & CONC PAV | 13,606 |
| 33 | PALO PINTO | US281 | GR,BS,HMAC,DR,STR,BR,SIGN,PVT MK | 10,304 |
| 34 | PARKER | FM51 | PLANING, HMAC, AND PAV MARKS | 6,626 |
| 35 | PARKER | FM1189 | GR,STR,FLX BS, SC, MBGF,SIGN,PVT MK | 3,100 |
| 36 | PARKER | IH20 | GR,HMAC,CRCP,STR,SGN,PVT MK,&SGNLS | 8,091 |
| 37 | POTTER | IH40 | RELOCATE ENTRANCE AND EXIT RAMPS | 8,076 |
| 38 | SAN PATRICIO | FM1069 | GR, STRS, BASE, SURF & C&G | 16,402 |
| 39 | SMITH | SH31 | GR,STRS,ACP BS & SURF,PVT MRK | 28,286 |
| 40 | TARRANT | IH820 | MILL, HOT MIX OVERLAY, PVT MARKINGS | 7,514 |
| 41 | TARRANT | CS | REPLACE BRIDGE | 998 |
| 42 | TARRANT | FM1938 | GR, BS, DR, STRUCTURES & PAVEMENT | 26,295 |
| 43 | TARRANT | FM157 | GR, BS AND PAVEMENT | 10,408 |
| 44 | TRAVIS | FM973 | REHAB RDWY, ADD 6' SHOULDERS | 13,280 |
| 45 | TRAVIS | US183 | REPAIR,MILL,SEAL&OVERLAY FRT RDS | 6,483 |
| 46 | WASHINGTON | SH105 | MILL/INLAY | 2,366 |
| 47 | WILLIAMSON | FM112 | DEPTH REPAIR, UNDERSEAL & THIN OV | 8,915 |
| 48 | WILLIAMSON | FM1460 | CONST 4-LN DIV<L | 83,726 |
| 49 | WILLIAMSON | IH35 | UPGRADE FRNTGE RDS & RELOCATE RAMPS | 13,494 |
| 50 | WISE | CR | REPLACE BRIDGE AND APPROACHES | 300 |
| 51 | WISE | CR | REPLACE BRIDGE AND APPROACHES | 83 |
| TOTAL TONNAGE FOR JULY LETTING | 1,015,394 |