The TxDOT highway letting is scheduled for June 12-13, 2014. Total tonnage of asphalt pavements being let is 1,090,982.
| # | COUNTY | HWY |
TYPE | TONS |
| 1 | BAYLOR | US277 | OVERLAY | 30,134 |
| 2 | BELL | FM2410 | ADD TRN LNS | 2,769 |
| 3 | BEXAR | IH10 | OVERLAY AND PAVEMENT MARKINGS | 54,887 |
| 4 | BEXAR | IH410 | SLOPE REPAIR, OVERLAY, MBGF, PAV MK | 17,573 |
| 5 | BRAZORIA | CS | REPLACE BRIDGE AND APPROACHES | 1,280 |
| 6 | BRAZORIA | CR | REPLACE BRIDGE AND APPROACHES | 54 |
| 7 | BURNET | RM243 | GUARDRAIL&SAFETY TREAT FIXED OBJCTS | 7,313 |
| 8 | CALDWELL | SH80 | INSTALL CONTINUOUS TURN LANE | 1,344 |
| 9 | CAMERON | IH69E | RAMP IMPROVEMENTS | 1,807 |
| 10 |
COLLIN | US380 | GR,DR,STR,PAV,SIGN,PAV MRKS,CON PAV | 61,184 |
| 11 |
COLLIN | FM428 | SHLDR WDN,BS REP,UNDERSEAL,OV | 7,577 |
| 12 | COMAL | IH35 | GRAD, BASE, STR, PAVMNT MRKNGS | 7,931 |
| 13 | CORYELL | US190 | BASE REPAIR, UNDERDRAIN AND ACP OVERLAY | 4,479 |
| 14 |
DALLAS | CS | REPL BR & APPRS | 90 |
| 15 | DALLAS | US175 | MILL, FDR AND ACP OVERLAY | 15,234 |
| 16 | DALLAS | US75 | GRADING,PAVEMENT,SIGNS,PVMT MKGS | 1,419 |
| 17 | DALLAS | IH635 | GRADING,STRUCTURING,SURFACING | 2,242 |
| 18 | DALLAS | IH345 | IH345 ROADWAY AND RETAINING WALL REPAIR | 817 |
| 19 | DALLAS | SH78 | FDR,MILL,ACP OVERLAY AND PVMNT MRK | 5,564 |
| 20 |
DENTON | FM455 | REPLACE EXISTING BRIDGE AND APPROAC | 3,924 |
| 21 |
DIMMIT | FM468 | BASE REPAIR,ACP OV,SIGNS & PV MRKS | 26,448 |
| 22 |
FOARD | SH6 | REPLACEMENT OF EXISTING BRIDGE | 761 |
| 23 |
FT. BEND | FM762 | INSTALL TURN LANE & IMPROVE SHLDS | 1,028 |
| 24 | FRIO | FM1582 | GRADE, BASE, SC, SURF, PAVMT MRK | 70,091 |
| 25 | GALVESTON | CR | REPLACE BRIDGE AND APPROACHES | 168 |
| 26 | GRAY | US60 | OVERLAY | 22,341 |
| 27 | GUADALUPE | VA | GRAD, BASE, SURF, STR, SIGN | 21 |
| 28 | HARDEMAN | SH6 | REHABILITATION OF EXISTING ROADWAY | 36,069 |
| 29 | HARDEMAN | SH6 | MISCELLANEOUS WORK | 1,955 |
| 30 | HARRISON | CR | REPLACE BRIDGE AND APPROACHES | 145 |
| 31 | HAYS | SH123 | MILL, LEVEL-UP, SEAL & THIN OVERLAY | 4,284 |
| 32 | HAYS | US290 | MILL, SEAL, & THIN OVERLAY | 4,284 |
| 33 | HAYS | SH123 | CONST GRADE SEPARATION | 33,576 |
| 34 | HEMPHILL | US60 | WIDENING EXISTING ROADWAY | 1,089 |
| 35 | HILL | FM3050 | BASE FAILURE PAVEMENT REPAIR | 1,495 |
| 36 | HOOD | FM167 | GR,BS,DR STRUCTURE & HMAC PAVEMENT | 6,593 |
| 37 | JACK | FM1156 | REPL BRIDGE AND APPROACHES | 543 |
| 38 | JOHNSON | FM2738 | SEAL COAT AND OVERLAY | 11,616 |
| 39 | KAUFMAN | FM2728 | GR, BASE, PVMT, PVMT MKGS, SIGNS | 32,366 |
| 40 | KAUFMAN | FM3039 | REWORK,CEMENT TR BS,SURF,PVMT MRKGS | 4,771 |
| 41 | KENDALL | SH46 | GR, BSE, SURF, PAVT MRK | 247 |
| 42 | KERR | SH16 | R, BSE, SURF, PAVT MRK | 4,759 |
| 43 | KLEBERG | FM1356 | REHAB AND WIDEN | 3,647 |
| 44 | LAMAR | US82 | WIDEN NON-FREEWAY | 39,296 |
| 45 | LASALLE | FM624 | GRAD, BASE, SURF, STRIPING | 11,995 |
| 46 | LAVACA | SH111 | PAVEMENT REPAIR AND RESURFACING | 24,006 |
| 47 | LEE | US77 | PAVEMENT REPAIR, LEVEL-UP & SEAL | 1,848 |
| 48 | LIMESTONE | SH7 | BASE FAILURE PVMNT REPAIR AND ACP O/L | 359 |
| 49 | LUBBOCK | SL289 | HOT MIX MILL AND INLAY | 6,401 |
| 50 | MCLENNAN | FM2837 | INTERS IMPRVMT | 3,533 |
| 51 | MCLENNAN | US77 | PLNG, SURF, ADD PASS LNS | 85,440 |
| 52 | MIDLAND | LP250 | LANING,HOTMIX,PAVEMENT MARKINGS | 43,804 |
| 53 | MONTAGUE | SH59 | REHABILITATION OF EXISTING ROAD | 21,750 |
| 54 | MONTGOMERY | FM149 | INST LT TN LNS | 10,510 |
| 55 | MONTGOMERY | FM2432 | INSTALL LEFT TURN LANE | 2,051 |
| 56 | MONTGOMERY | CR | REPLACE BRIDGE AND APPROACHES | 67 |
| 57 | NACOGDOCHES | FM204 | OCST AND SUPERPAVE | 5,803 |
| 58 | NACOGDOCHES | LP224 | IMPROVE GUARDRAIL AND SAFETY TREAT | 973 |
| 59 | NAVARRO | SH31 | FLEXIBLE PAVEMENT STRUCTURE AND OVERLAY | 16,110 |
| 60 | PALO PINTO | FM1821 | CONSTRUCTION OF RIGHT TURN LANES | 303 |
| 61 | PALO PINTO | SH16 | PAVEMENT REPAIR AND SEAL COAT | 19,014 |
| 62 | PANOLA | SH43 | ACP SURF & PAV MKS | 7,304 |
| 63 | POTTER | US87 | OVERLAY (SB LANES) | 21,381 |
| 64 | RANDALL | US60 | REPLACE BRIDGE | 123 |
| 65 | RED RIVER | SH37 | OVERLAY | 17,182 |
| 66 | ROCKWALL | FM551 | BASE REPAIR, LEVEL UP, OVERLAY | 16,555 |
| 67 | SABINE | FM1 | SAFETY TREAT FIXED OBJECTS | 822 |
| 68 | SABINE | FM1592 | SAFETY TREAT FIXED OBJECTS | 1,067 |
| 69 | SHELBY | SH7 | IMPROVE GUARDRAIL TO DES STANDARDS | 2,264 |
| 70 | SMITH | FM850 | CRACK SEAL, PLNG, OCST,HMAC LVL-UP | 14,799 |
| 71 | TAYLOR | FM2404 | FL PAV SPOT RPR, SUPER PAV | 4,360 |
| 72 | TAYLOR | BI20-R | ACP,DRVWYS,UNDRSL,PLAN,MBGF,BR RAIL | 8,648 |
| 73 | TRAVIS | MR678 | ROADWAY AND PARKING LOT MAINTENANCE | 575 |
| 74 | TRAVIS | SH45 | MILL, SEAL & THIN OVERLAY | 6,527 |
| 75 | TRAVIS | LP275 | RECONST TO 4-LN DIVIDED RDWY | 15,816 |
| 76 | TRAVIS | US290 | MILL, SEAL & 1.5 INCH OVERLAY | 21,227 |
| 77 | UPSHUR | SH155 | ACP SURF & PAV MKS | 5,120 |
| 78 | UVALDE | SH127 | REPLACE BRIDGE AND APPROACHES | 786 |
| 79 | VAN ZANDT | IH20 | IH 20 TOTAL MAINTENANCE | 9,240 |
| 80 | WEBB | IH35 | RDWY WIDENING, BLADE LEVEL UP, SPOT BASE | 7,000 |
| 81 | WHARTON | US59 | RAISE STRUCTURES | 4,322 |
| 82 | WICHITA | IH44 | REPLACE BRIDGE AND APPROACHES | 117 |
| 83 | WILLIAMSON | IH35 | OVERLAY NB&SB FRONTAGE ROADS | 47,483 |
| 84 | WILLIAMSON | IH35 | REPLACE BRIDGE & APPROACHES | 8,657 |
| 85 | WILLIAMSON | FM397 | PAVEMENT REPAIR & OVERLAY | 5,871 |
| 86 | WILLIAMSON | RM1431 | CONST DIVERGING DIAMOND INTRSCTN | 12,103 |
| 87 | ZAVALA | US83 | ACP, OVRLAY, PAV MRK, STRUC, SIGN | 62,451 |
| TOTAL TONNAGE FOR JUNE LETTING | 1,090,982 |