The TxDOT highway letting is scheduled for May 7th and 8th. The total tonnage of asphalt pavements being let is 761,372.
| # | COUNTY | HWY |
TYPE | TONS |
| 1 | BASTROP | FM535 | REPAIR, LEVEL-UP AND SEAL COAT | 5,604 |
| 2 | BASTROP | FM304 | UPGRD TO 3 LN SEC WITH SHOULDERS | 27,952 |
| 3 | BRAZORIA | CS | REPLACE BRIDGE | 64 |
| 4 | BRAZORIA | SH332 | BS RPR, PLAN, & 1.5 ACP OVERLAY | 11,124 |
| 5 |
BRAZORIA | FM521 | PV REP,SC,ACP O/L & PVMNT MRKS | 13,674 |
| 6 |
CALDWELL | FM1984 | SEAL COAT | 1,948 |
| 7 | CALHOUN | SH185 | RESURFACE EXISTING ROADWAYS | 17,655 |
| 8 | CAMP | SH11 | GR, BASE, SURFACING & PVMT MARKERS | 404 |
| 9 | CLAY | US82 | REHABILITATION OF EXISTING ROAD | 17,331 |
| 10 |
COLLIN | SH5 | FULL DEPTH REPAIR AND OVERLAY | 11,000 |
| 11 |
CORYELL | PW | CONSTR/RECONSTR PARK RD/ACCESS RDS | 5,787 |
| 12 |
DALLAS | SH78 | FULL DEPTH CONC PAVMNT REPAIR. | 167 |
| 13 | DALLAS | SH289 | INTERSECTION IMPROVEMENT | 540 |
| 14 | DAWSON | US87 | PLANING,REWORK BASE,ACP & ONE CRSE | 75,561 |
| 15 |
DENTON | FM2181 | GRADING, BASE ACP AND STRUCTURES | 44,137 |
| 16 | DEWITT | FM 952 | REPLACE BRIDGE & APPROACHES | 279 |
| 17 | EASTLAND | IH 20 | MILL & INLAY (PRODUCTION AND WILL-CALL) | 3,677 |
| 18 | FANNIN | SH34 | OVERLAY | 2,385 |
| 19 | FAYETTE | US77 | PAVEMENT REHAB & ACP OVERLAY | 25,542 |
| 20 | FT. BEND | FM2234 | INTERSECTION IMPROVEMENTS | 1,457 |
| 21 |
FT. BEND | CS | GR, STRS, BASE PV W/ CURB & GUTTER | 1,080 |
| 22 |
GONZALES | PW | WIDEN AND OVERLAY RV PULLOUTS | 2,269 |
| 23 |
GONZALES | FM108 | REPLACE BRIDGE AND APPROACHES | 1,198 |
| 24 |
GONZALES | FM108 | WIDEN BRIDGE AND APPROACHES | 421 |
| 25 |
GRAYSON | FM131 | OVERLAY | 3,257 |
| 26 |
HARRIS | US290 | GR, STRS, BASE AND PAVE | 68,004 |
| 27 |
HARRIS | LP494 | MILL AND OVERLAY | 5,599 |
| 28 |
HARRIS | FM2100 | MILL AND ACP OVERLAY | 60,739 |
| 29 |
HARRIS | VA | SLOPE REP AND CHANNEL STABILIZATION | 87 |
| 30 |
HIDALGO | VA | PEDESTRIAN & BICYCLE ACCESS | 290 |
| 31 |
HOUSTON | FM2022 | PROVIDE ADDITIONAL PAVED SURF WIDTH | 12,673 |
| 32 |
HOWARD | IH20 | CONSTRUCT NEW INTERCHANGE | 43,965 |
| 33 | HUNT | SH276 | REHABILITATION OF EXISTING ROAD | 8,316 |
| 34 |
JOHNSON | SH174 | TRAFFIC SIGNAL INSTALLATION | 332 |
| 35 |
JOHNSON | US67 | HMAC OVERLAY | 42,692 |
| 36 |
KAUFMAN | SH34 | HOT MIX OVERLAY, BASE BLADE, PAV MRK | 10,929 |
| 37 | LAMAR | FM137 | BRIDGE REPLACEMENT | 282 |
| 38 |
LAVACA | SH111 | PAVEMENT REPAIR AND ACP OVERLAY | 24,440 |
| 39 |
LEE | CR | REPLACE BRIDGE & APPROACHES | 255 |
| 40 |
LLANO | SH71 | UPGRADE TO SUPER 2 & ADD LTL'S | 4,086 |
| 41 | MADISON | SH75 | HMA OVERLAY | 8,280 |
| 42 |
McLENNAN | SH6 | BRIDGE PREVENTIVE MAINTENANCE | 144 |
| 43 | MONTAGUE | FM455 | REHABILITATION OF EXISTING ROADWAY | 26,500 |
| 44 | MOTLEY | SH70 | REPLACEMENT OF EXISTING ROADWAY | 960 |
| 45 | NUECES | SH44 | GRADE, BASE, SURF, STRS | 29,265 |
| 46 | OLDHAM | US385 | OVERLAY | 3,462 |
| 47 | PARMER | SH86 | BRIDGE PREVENTIVE MAINTENANCE | 457 |
| 48 | SAN SABA | CS | HMCL ACP TY-D SAC-B AC-1.5 | 12 |
| 49 | SAN SABA | US190 | MILL & INLAY, W /UNDERSEAL | 2,247 |
| 50 | SMITH | SH64 | GR, SURF, BASE, ACP, PAVT MARKS | 6,974 |
| 51 | SMITH | SP364 | 2" MILL, OCST, 2' INLAY | 20,596 |
| 52 | TARRANT | IH30 | GR, BS AND SURFACE | 691 |
| 53 | TOM GREEN | US67 | EXTEND SOUTHBOUND FRONTAGE ROAD | 315 |
| 54 | TRAVIS | FM734 | OVERLAY AND RESTRIPE FOR BICYCLE LANE | 1,420 |
| 55 | VICTORIA | US59 | CONSTRUCT FRONTAGE ROADS | 58,403 |
| 56 | WALKER | SH75 | UPGRADE INTERCHANGE TO STANDARDS | 15,485 |
| 57 | WALKER | IH45 | HMA OVERLAY | 18,013 |
| 58 | WICHITA | SH79 | REHABILITATION OF EXISTING ROADWAY | 1,931 |
| 59 | WISE | FM51 | HMAC OVERLAY | 17,005 |
| TOTAL PROJECTS SCHEDULED FOR MAY | 761,372 |