The TxDOT highway letting is scheduled for February 5th and 6th. The total tonnage of asphalt pavements being let is 733,630.
| # | COUNTY | HWY |
TYPE | TONS |
| 1 | ANDERSON | US84 | PLANING, OCST, ACP SURF, PVMT MRKG | 8,449 |
| 2 | ANGELINA | US69 | INTERSECTION IMPROVEMENTS | 22,011 |
| 3 | BEXAR | IH37 | MILL, SURF, SC, OV & PAV MRK | 73,208 |
| 4 | BURNET | SH29 | ADDING CENTER TURN LANE AND 3' SHLDRS | 2,654 |
| 5 |
CALHOUN | FM2143 | DEMO., STRUCTURAL, BASE, SURFACING | 318 |
| 6 |
CHAMBERS | IH10 | PLANE, MBGF, PFC | 29,879 |
| 7 | CHEROKEE | FM347 | ACP WIDENING,OVERLAY,AND PAVEMENT MARKER | 5,581 |
| 8 | CONCHO | FM380 | REMOVE AND REPLACE DRAINAGE STRUCTURE | 111 |
| 9 | COOKE | US82 | BRIDGE REPLACEMENT | 482 |
| 10 |
CORYELL | FM929 | REPL BR & APPRS | 786 |
| 11 |
DALLAS | US80 | REPAIR SLOPE WITH HEADWALL | 11 |
| 12 |
DEWITT | US183 | CONSTRUCT AUX. LANES FOR SUPER 2 | 67,735 |
| 13 | EL PASO | SS1966 | CONSTRUCTION OF SPUR | 2,653 |
| 14 | ERATH | FM988 | MILL, BASE AND HMAC OVERLAY | 7,833 |
| 15 |
FANNIN | FM896 | BASE REHAB | 173 |
| 16 | GILLESPIE | RM783 | PROVIDE ADDITIONAL PAVED SURFACE WI | 9,769 |
| 17 | HARRIS | CS | BS REP,PLANING, 2" O/L & PV_MRKS | 27,570 |
| 18 | HARRIS | SP330 | BS REP, MILLING, & ACP OVERLAY | 9,144 |
| 19 | HARRIS | CS | WIDEN TO 6 LANE DIVIDED | 978 |
| 20 | HARRIS | IH45 | TMS IMPRVMTS CONT NB & SB DCS | 1,035 |
| 21 |
HARRIS | IH610 | SEAL COAT, CAM LEVEL-UP, TOM OVERLAY | 7,808 |
| 22 |
HASKELL | US277 | MILLING,SPOT BASE REP & SURFACING | 18,440 |
| 23 |
HENDERSON | SH274 | SUBGRADE WIDEN, LEVEL-UP, OCST | 26,380 |
| 24 |
HIDALGO | CR,ETC | REPLACE BRIDGE & RECONST APPROACHES | 155 |
| 25 |
HILL | FM933 | WDN, GR, STRS & SURF | 22,997 |
| 26 |
HOUSTON | FM1280 | PROVIDE ADDITIONAL PAVED SURF WIDTH | 35,090 |
| 27 |
HOWARD | MR686 | PARKING AREA - CURB AND GUTTER | 1,117 |
| 28 |
HUTCHINSON | SH136 | REPLACE BRIDGE AND APPROACHES | 356 |
| 29 |
JASPER | FM2799 | EDGE STABILIZATION | 515 |
| 30 |
JASPER | FM254 | EDGE STABILIZATION | 132 |
| 31 |
JEFFERSON | SH82 | INSTALL FLEX BASE AND ACP OVERLAY | 126 |
| 32 |
LAMAR | US82 | ON CALL MILLING & HOTMIX INLAY | 6,325 |
| 33 |
LEE | PW | PAVE VARIOUS ROADS/PARKING AREAS | 3,945 |
| 34 |
LUBBOCK | US62 | GRD,ACP,CRCP,TREAT SUBGRD,CG,STR OP | 33,981 |
| 35 |
MADISON | SH75 | HMA OVERLAY | 8,280 |
| 36 |
MCLENNAN | LP574 | GR, STRS & SURF | 11,020 |
| 37 |
MIDLAND | LP250 | ROADWAY REHABILITATION | 10,658 |
| 38 |
MILAM | US190 | REHABILITATE EXISTING ROADWAY | 37,023 |
| 39 |
NACOGDOCHES | FM2782 | REHABILITATION OF EXISTING ROAD ACCESS | 2,391 |
| 40 |
NOLAN | SH70 | ACP OVERLAY | 26,558 |
| 41 | NOLAN | BS70G | REHABILITATION, ACP, SIDEWALKS | 17,969 |
| 42 |
PALO PINTO | US180 | MILL AND OVERLAY | 10,300 |
| 43 | PECOS | IH10 | MILL,UNDERSEAL,HMAC,PAV MRKS&MARKER | 16,179 |
| 44 | POLK | US59 | REHABILITATE EXISTING PAVEMENT | 31,135 |
| 45 | POTTER | US87 | REPLACE BRIDGE AND APPROACHES | 157 |
| 46 | SAN PATRICIO | IH37 | MILL, SEAL AND OVERLAY | 27,208 |
| 47 | TARRANT | SH180 | MILL, PAVT REPAIR AND OVERLAY | 23,903 |
| 48 | TARRANT | SH10 | GR, BS, PAVEMENT AND TRAFFIC SIGNAL | 664 |
| 49 | TARRANT | SH199 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | 5,000 |
| 50 | TARRANT | US287 | BRIDGE REPLACEMENT | 4,765 |
| 51 | TAYLOR | BI20I | BRIDGE REPLACEMENT | 3,493 |
| 52 | TAYLOR | LP322 | SPOT BASE RPR,UND SL,OV, MBGF | 29,036 |
| 53 | TOM GREEN | US87 | ACP OVERLAY | 8,807 |
| 54 | TRAVIS | VA | CONSTRUCT SIDEWALKS | 111 |
| 55 | TRAVIS | US290 | INNOVATIVE INTERSECTION IMPROVEMENT | 11,755 |
| 56 | TRAVIS | US290 | PAVEMENT REPAIR & SEAL COAT | 6,500 |
| 57 | TRAVIS | RM1431 | ADD LEFT TURN LANE | 69 |
| 58 | WILLIAMSON | FM972 | PAVEMENT REPAIR & SEAL COAT | 2,222 |
| 59 | WISE | US81 | HMAC OVERLAY | 10,680 |
| TOTAL | TOTAL ALL PROJECT | 733,630 |