The TxDOT highway letting is scheduled for December 4th & 5th. The total tonnage of asphalt pavements being let is 670,587.
| # | COUNTY | HWY |
TYPE | TONS |
| 1 | BASTROP |
US 290 |
EXTEND LEFT TURN LANE AT MEDIAN | 205 |
| 2 | BAYLOR |
US 277 |
UPGRADE TO 4 LANE FACILITY | 32,633 |
| 3 | BEXAR |
IH 10 |
RECONST. AND RECONFIGURE INTERSECT.RAMP & FRONTAGE | 2,760 |
| 4 |
BEXAR |
IH 35 |
OVERLAY AND PAVEMENT MARKINGS | 6,838 |
| 5 |
BEXAR |
IH 10 |
SURF, PAV MARK, BASE REPAIR | 20,532 |
| 6 |
BLANCO, ETC |
US 281 |
MILL, SEAL & OVERLAY | 59,258 |
| 7 | BRAZORIA |
FM 523 |
INSTALL LEFT TURN LANES | 1,907 |
| 8 | BRAZOS |
SH 6 |
UPGRADE FREEWAY RAMPS | 45,236 |
| 9 | CHEROKEE |
SH 294, ETC |
STRS,SUBGRD WDN,ACP BS&LV L-UP,OCST,MBGF,PV MK | 46,094 |
| 10 |
DALLAS |
LP 12 |
FULL DEPTH REPAIR, MILL AND ACP OVERLAY | 7,764 |
| 11 |
DALLAS |
CS |
WIDEN 2 TO 4 LN DIV LN) W/GR SEP | 8,214 |
| 12 |
DALLAS, ETC |
IH 30, ETC |
CONSTRUCT MANAGED/HOV LANE GANTRIES W/ RAMPS | 23,973 |
| 13 | DICKENS |
SH 208 |
REHABILITATION OF EXISTING ROADWAY | 9,645 |
| 14 | EL PASO |
LP 375, ETC |
MILL AND INLAY | 4,120 |
| 15 |
GREGG |
US 80 |
WDN,BS,SURF,STM SWR,CLVT EXT,C&G,SFTY IMPRV,SGN,PM | 13,856 |
| 16 | GUADALUPE |
SH 123 |
GRAD, BSE, SURF, PAV'T MRK, SIGNAL | 27,389 |
| 17 | HARDEMAN |
US 287 |
ASPHALTIC CONCRETE PAVEMENT OVERLAY | 29,107 |
| 18 | HARRIS |
US 90A |
RECONSTRUCT, FULL DEPTH, MILL | 3,352 |
| 19 |
HARRIS |
US 290 |
ASPHALT & POTHOLE REPAIR | 100 |
| 20 | HAYS |
RM 12 |
INTERSECTION IMPROVEMENTS | 853 |
| 21 |
HEMPHILL |
US 83 |
REHAB EXISTING ROADWAY | 9,673 |
| 22 |
JACK |
US 380 |
SEAL COAT | 8,847 |
| 23 |
KARNES, ETC |
US 181 |
CONSTRUCT ADDITIONAL PASSING LANES | 43,863 |
| 24 |
KAUFMAN |
SH 274 |
BASE REPAIR & LEVEL UP | 1,902 |
| 25 |
KNOX |
SH 6 |
ACP WIDENING AND ACP OVERLAY | 31,165 |
| 26 |
LIVE OAK |
SH 72 |
WIDEN AND OVERLAY ROADWAY | 13,091 |
| 27 |
LIVE OAK |
SH 72 |
CONSTRUCT PASSING LANES | 41,032 |
| 28 |
LLANO |
SH 29 |
LEVEL-UP & SEAL COAT | 9,820 |
| 29 |
LUBBOCK |
CS |
GRAD, BASE, C&G, ACP, STR | 5,732 |
| 30 |
MCCULLOCH |
SH 71 |
WDN SUBGRADE, STR, SURFACE | 510 |
| 31 |
MCLENNAN |
LP 396 |
MICROSURF, REALIGN CURB, WIDEN PAVMNT @ COBBS DR | 45 |
| 32 |
MIDLAND |
IH 20 |
REBUILD DRIVING LANES, OVERSEAL | 20,625 |
| 33 |
MONTAGUE, ETC |
US 82, ETC |
OVERLAY | 9,549 |
| 34 |
MONTGOMERY |
US 59 |
ASPHALT PAVEMENT REPAIR | 434 |
| 35 |
REFUGIO |
US 77 |
MILL,SEAL AND OVERLAY_(NB LANES ONLY) | 25,746 |
| 36 |
SHELBY |
US 59 |
REHABILITATE EXISTING PAVEMENT | 23,730 |
| 37 |
SHELBY |
FM 711 |
RECONSTRUCT AND WIDEN PAVEMENT | 28,080 |
| 38 |
TARRANT |
IH 820 |
HMAC OVERLAY | 28,488 |
| 39 |
TRAVIS |
RM 620 |
RESTRIPE, ADD DUAL RTL AND REPL SIGNALS | 1,690 |
| 40 |
TRAVIS |
SH 71 |
LEVEL-UP & SEAL COAT | 1,286 |
| 41 |
WEBB |
SL 20 |
FLEX BSE, SURF, BRIDGE, PAV MRK ETC | 11,115 |
| 42 |
WEBB |
IH0035 |
INSTALL RAISED MEDIAN, SIGNING & STRIPING | 1,690 |
| 43 |
WICHITA |
SH 240 |
OVERLAY | 250 |
| 44 |
WILLACY |
FM 490 |
REHAB OF EXISTING ROADWAY | 6,396 |
| 45 |
ZAVALA |
US 57 |
CONSISTING OF PLANING AND OVERLAY | 1,992 |
| TOTAL | 670,587 |