The TxDOT highway letting is scheduled for October 6 & 7. The total tonnage of hot mix being let is 464,311.
|
# |
County |
Hwy |
Description |
Tonnage |
|
1 |
CULBERSON | SH 54 | OVERLAY |
2,904 |
|
2 |
FANNIN | FM 3297 | BASE REHABILTATION |
80 |
|
3 |
HARDIN | US 96 | ADD TURN LANES |
394 |
|
4 |
HARRIS |
VA | REHAB AND OTHER MISC WORK |
108 |
|
5 |
HARRIS | VA | REPLACE VIAS |
72 |
|
6 |
HARRIS | MH | CONSTRUCT 8-LANE DIVIDED (RAISED MEDIAN) URBAN ST. |
6,177 |
|
7 |
HIDALGO, ETC. | SH 107, ETC. | OVERLAY |
90,756 |
|
8 |
JEFFERSON | SH 347 | INSTALL LEFT TURN LANE |
320 |
| 9 | JOHNSON | IH 35W | HMAC OVERLAY |
12,983 |
|
10 |
KAUFMAN | IH 20 | CONRETE PAVEMENT REPAIR AND SHOULDER TEXTURING |
43,748 |
| 11 | MCCLENNAN, ETC. | IH 36 | WDN, GR, STR & SURF |
139,077 |
|
12 |
MOTLEY | US 62 | ASPHALTIC CONCRETE OVERLAY |
55,459 |
|
13 |
NUECES | US 77 | LEVEL-UP OF EXISTING ROADWAY |
7,640 |
|
14 |
POTTER | VA | MISC CONSTRUCTION OF ADA CURB RAMPS |
71 |
| 15 | REEVES | IH 20 | FULL DEPTH REPAIR, SEAL, OVERLAY |
66,258 |
|
16 |
ROBERTSON | US 79 | CONSTRUCTION OF A TWO-WAY LEFT TURN LANE |
6,528 |
| 17 | SMITH | SH 31 | MILLING, CURB & GUTTER AND EMBANKMENT |
161 |
|
18 |
TARRANT | US 287 | FLEXIBLE PAVEMENT STRUCTURE REPAIR |
2,250 |
|
19 |
TARRANT | IH 20 | DRAINAGE IMPROVEMENT |
17 |
|
20 |
UVALDE | RM 1050, ETC. | WIDEN EXISTING ROADWAY AND ADD SHOULDERS |
434 |
|
21 |
WALKER | IH 45 | FULL DEPTH SPOT CONCRETE REPAIR |
929 |
|
22 |
WILLIAMSON | RM 2243 | TRAFFIC SIGNAL & RR PRE-EMPTION |
2 |
| 23 | WILLIAMSON | IH 35 | PAVEMENT REPAIR AND OVERLAY |
27,943 |
|
|
|
|||
|
|
|
|||
|
|
TOTAL |
464,311 |