The TxDOT highway letting is scheduled for March 8 & 9. The total tonnage of hot mix being let is 593,238.
|
# |
County |
Hwy |
Description |
Tonnage |
|
1 |
Austin |
CR |
Replace Bride and Approaches |
10 |
|
2 |
Bastrop |
LP 150 |
Mill, Seal and Overlay |
1,386 |
|
3 |
Bexar |
PW |
Resurface Paved Roads & Parking Lots in the Facility |
2,334 |
|
4 |
Brazoria |
CS |
Replace Bridges and Approaches |
876 |
|
5 |
Camp |
US 271 |
UTBHMWC Overlay & Pavement Markings |
6,486 |
|
6 |
Collin |
US 75 |
Reconstruct and Widen Freeway and Frontage Roads |
129,383 |
|
7 |
Comal |
FM 2252 |
Pavement Restoration |
5,045 |
|
8 |
Dallas |
IH 45 |
General Routine Maintenance |
20,200 |
|
9 |
Dallas |
SH 289 |
Intersection Improvements |
1,477 |
|
10 |
Dallas |
PW |
Rehabilitation of Park Road |
10,244 |
|
11 |
Duval, Etc |
US 59 |
Rehab of Highway and Add Passing Lanes |
27,597 |
|
12 |
El Paso |
LP 375 |
Construction of Pond |
146 |
|
13 |
Fannin |
SH 121 |
Cam and TBPFC Overlay |
71,232 |
|
14 |
Hardeman |
US 287 |
Rehabilitate Existing Roadway |
17,588 |
|
15 |
Hays |
SH 80 |
Rehabilitate Roadway |
5,980 |
|
16 |
Henderson, Etc. |
SH 19, ETC |
Harst, OCST, HMAC, MBGF & PV Mk |
2,837 |
|
17 |
Hood |
CR |
Replace Bridge & Approaches |
573 |
|
18 |
Hunt |
SH 224 |
Mill and Inlay |
1,4420 |
|
19 |
Jasper |
PW |
Construct Entrance Road to East Texas Fish Hatchery |
4,267 |
|
20 |
Jasper |
US 96 |
Edge Stabilization |
427 |
|
21 |
Jasper |
FM 254 |
Edge Stabilization |
15 |
|
22 |
Jefferson |
US 69 |
Patch & Overlay Main Laines |
17,309 |
|
23 |
Kaufman |
SH 34 |
Constr 4-Lane Highway and US 80/RR Overpass |
16,651 |
|
24 |
Matagorda |
FM 616 |
Milling & Resurfacing Roadways |
10,282 |
|
25 |
Montgomery |
US 59 |
ACP Overlay |
7,109 |
|
26 |
Morris |
US 259 |
Milling, ACP & Pavement Markings |
1,958 |
|
27 |
Real |
RM 336 |
LRA Level Up |
3,780 |
|
28 |
Red River |
BU 82J |
Mill & Inlay |
5,157 |
|
29 |
San Augustine |
SH 147 |
Reconsruct Pavement |
7,770 |
|
30 |
San Patricio |
SH 35 |
Grade, Base, Surf, STRS |
46,042 |
|
31 |
Tarrant |
US 287 |
Flexible Pavement Structure Repair |
6,820 |
|
32 |
Travis |
SH 130 |
Frontage Road Overlay |
9,696 |
|
33 |
Van Zandt |
CR |
Replace Bridge & Approaches |
196 |
|
34 |
Victoria |
LP 463 |
Construct 2 4-Lane Overpasses |
40,265 |
|
35 |
Walker |
IH 45 |
HMA Overlay |
34,967 |
|
36 |
Waller |
FM 1736 |
Asphalt Concrete Pavement Overlay |
3,200 |
|
37 |
Webb |
LP 20 |
Restore Existing Drainage Structure & Roadway |
6 |
|
38 |
Webb |
US 83. |
Lengthen Left Turn Lane |
2,544 |
|
40 |
Webb |
IH 35 |
Pot Base Repair of Existing |
13,280 |
|
41 |
Williamson |
FM 3406 |
Underseal, Overlay and Pav. Markings |
3,664 |
|
42 |
Williamson |
IH 35 |
Overlay (Northbound Mainlanes) |
26,654 |
|
43 |
Williamson |
SH 45 |
Mill, Seal and Overlay |
3,619 |
|
44 |
Williamson |
SH 45 |
Excavation, Pavement Repair, Flex Base, etc. |
17,029 |
|
45 |
Williamson |
LP 332 |
Replace Bridge and Approaches |
2,068 |
|
|
|
|
|
|
|
|
|
|
Total |
593,238 |
|
|
|
|
|
|