The TxDOT highway letting is scheduled for July 7-8, 2016. The total tonnage for June is 400,424.


# COUNTY HWY TYPE  TONS
1 AUSTIN FM 109 INCREASE SUPERELEVATION  4,748
2 BEXAR IH 10 GRAD,STRUC,BASE,SURF, CLEAN & PAINT 4,110
3 BLANCO US 281 CNSTRCT PVD SHLDRS,CORRECT SUPRELV 1,460
4 CAMERON SH 4 REHABILITATION ON SH 04  10,580
5 ECTOR IH 20 MISCELLANEOUS CONCRETE REPAIR 17
6 ERATH US 281 GR, BS, STRUCTURES AND PAVEMENT  100,550
7 FORT BEND SS 10 GR, STRS, BASE & SURF  5,293
8 GRIMES SH 6 IMPROVE CROSSOVERS AND TURN LANES 20,710
9 HARRIS IH 10 REPLACE RAMP   768
10 HARRIS FM 2920 SEAL COAT, OVERLAY & PV MKS 31,395
11 HUNT SS 1570 CONSTRUCT ROADWAY 18,540
12 JOHNSON FM 2738 YR, BS, DR, STR, & PAVT 9,102
13 KARNES SH 80 REHAB ROADWAY 23,175
14 KAUFMAN US 80 FLEXIBLE PAVE STRUCT RPR & OVERLAY  4,846
15 KENDALL SH 46 GRAD, BSE, STR, SURF, PAV'T MRK    17,359
16 McLENNAN SH 317 WDN, GR, SURF, ADD SHLDRS   65,151
17 McLENNAN US 84 REHAB RDWY, ADD PASS LNS  57,376
18 NUECES FM 43 GRADE, BASE, SURF 13,994
19 TARRANT CS REPLACE BRIDGES AND APPROACHES 949
20 WEBB SH 44 REPLACEMENT OF AN EXISTING BRIDGE  2,575
21 WEBB FM 1472 BASE, GRADE, CONCRETE PAVEMENT, ETC  7,376
22 WHARTON US 59 CALL-OUT CONCRETE PUNCH OUT 350
TOTAL 400,424

 