Monday, November 30, 2015
Past Issues | www.texasasphalt.org | Printer-Friendly | Subscribe | Advertise

TxDOT December 2015 Projects

Print Print this Article | Send to Colleague

The TxDOT highway letting is scheduled for December 2-3, 2015. The total tonnage for December is 1,364,390.

# COUNTY HWY TYPE TONS
1 ANDERSON US 75 GR,SUB BS,BS,HMAC,DRAIN STRS,SIGNS 77,382
2 BASTROP SH 71 CONST. OVERPASS AND 4 MAIN LNS 35,746
3 BASTROP SH 95 SEAL AND OVERLAY 12,812
4 BEXAR IH 35 REPLACE BRIDGE AND APPROACHES 4,236
5 CALDWELL SH 80 WIDEN RDWY, OVERLAY & PVMT MRKS 1,152
6 CHEROKEE US 69 PLNG,HMAC,MBGF,BS RPR,OCST,PFC SURF 33,106
7 CHILDRESS US 62 REHABILITATION OF EXISTING ROADWAY 33,573
8 COLLIN US 75 GRADING, BASE, PVMT, STR, SIGNS 130,635
9 COLORADO FM 949 INCREASE SUPERELEVATION 1,524
10 COOKE FM 51 OVERLAY 4,860
11 DALLAS IH 30 GR, STRS & PAV 11,760
12 EL PASO SL 375 WIDEN TO 6 LANES 17,790
13 ELLIS CR REPL BR 87
14 FORT BEND US 59 GR, STRS, BS & SURF 19,676
15 FORT BEND US 90A WIDEN TO 6 LANES WITH ASPHALT 32,408
16 GALVESTON FM 646 GR, BASE, SURF, STRS 2,479
17 GONZALEZ SH 97 ACP OVERLAY 24,850
18 GRAYSON SH 91 EMERGENCY RELIEF PROJECT 758
19 HARRIS CR ITS FOR HIGH DEMAND ARTERIAL STREET 50
20 HARRISON IH 20 PLANE,CONC PVMT REP,ACP SF,PAV MRK 41,686
21 HAYS IH 35 GRADING, BASE, PVMT, STRUCT & PVMT 20,249
22 HILL FM 933 SEAL/OVLY 6,632
23 HOUSTON FM 3151 RECONSTRUCT AND WIDEN PAVEMENT 33,428
24 JASPER SH 62 GR, BS, OV, STRIPE 28,629
25 JIM WELLS FM 665 MILL AND FILL 5,254
26 KARNES FM 239 GRADE,BASE,SURF 54,519
27 KAUFMAN FM 1388 GR, BASE, ACP OVERLAY, PVMT MKGS 15,372
28 KING US 82 REHABILITATION OF EXISTING ROADWAY 22,616
29 LIMESTONE FM 39 WDN, GR, BS, SURF & ADD SHLDRS 16,347
30 LLANO SH 71 FULL DEPTH, LEVEL UP AND SEAL COAT 14,025
31 LUBBOCK US 82 MILLING, GRADING, HMA 15,120
32 MASON SH 29 LEVEL UP & SEAL COAT 29,921
33 McLENNAN SH 6 CONSTR OP/RAMPS; EXTEND FRTG RDS 51,880
34 McMULLEN SH 37 GRADE, BASE, STRUC, SURF, PAV_MRK 140,037
35 MILAM FM 908 ROADWAY RESTORATION 362
36 MILAM US 190 HMA OVERLAY 32,117
37 MONTAGUE FM 1806 BRIDGE CONSTRUCTION 378
38 MONTGOMERY FM 2978 GR, STRS, BASE AND PAVE 14,555
39 NACOGDOCHES US 59 IMPROVE GUARDRAIL TO DES STANDARDS 379
40 NUECES SH 361 GRADE,BASE,SURF,STRS 36,059
41 SAN PATRICIO SH 359 MILL AND FILL 7,451
42 SHELBY SH 71 SAFETY TREAT FIXED OBJECTS 1,253
43 SMITH VA CURB RAMPS 39
44 SMITH SS 248 ECONSTR GR,STRS,BS,C&G, SURF & PAV 14,138
45 STERLING US 87 ACP OVERLAY 58,844
46 TARRANT CS GR, BS, PAVEMENT AND STRIPING 24,937
47 TOM GREEN US 67 ACP OVERLAY 52,857
48 TRAVIS IH 35 BRIDGE REPLACEMENT 4,724
49 WEBB SL 20 FLEX BSE, SURF, BRIDGE, PAV MRK ETC 87,070
50 WHEELER US 83 WIDENING OF A NON-FREEWAY FACILITY 40,664
51 WICHITA BU 2873 OVERLAY 3,289
52 WILBARGER US 70 WIDENING OF A NON-FREEWAY FACILITY 2,872
53 WILLIAMSON IH 35 NORTHBOUND OPERATIONAL IMPROVEMENTS 41,803
TOTAL FOR DECEMBER 1,364,390
 
Ergon Asphalt & Emulsions, Inc.
Road Science, Division of ArrMaz
Martin Asphalt
Roadtec, Inc.
Lhoist North America
MWV Specialty Chemicals
Dedicated to Quality
Asphalt: Smooth | Durable | Quiet | Safe