The TxDOT highway letting is scheduled for December 2-3, 2015. The total tonnage for December is 1,364,390.
| # |
COUNTY |
HWY |
TYPE |
TONS |
| 1 |
ANDERSON |
US 75 |
GR,SUB BS,BS,HMAC,DRAIN STRS,SIGNS |
77,382 |
| 2 |
BASTROP |
SH 71 |
CONST. OVERPASS AND 4 MAIN LNS |
35,746 |
| 3 |
BASTROP |
SH 95 |
SEAL AND OVERLAY |
12,812 |
| 4 |
BEXAR |
IH 35 |
REPLACE BRIDGE AND APPROACHES |
4,236 |
| 5 |
CALDWELL |
SH 80 |
WIDEN RDWY, OVERLAY & PVMT MRKS |
1,152 |
| 6 |
CHEROKEE |
US 69 |
PLNG,HMAC,MBGF,BS RPR,OCST,PFC SURF |
33,106 |
| 7 |
CHILDRESS |
US 62 |
REHABILITATION OF EXISTING ROADWAY |
33,573 |
| 8 |
COLLIN |
US 75 |
GRADING, BASE, PVMT, STR, SIGNS |
130,635 |
| 9 |
COLORADO |
FM 949 |
INCREASE SUPERELEVATION |
1,524 |
| 10 |
COOKE |
FM 51 |
OVERLAY |
4,860 |
| 11 |
DALLAS |
IH 30 |
GR, STRS & PAV |
11,760 |
| 12 |
EL PASO |
SL 375 |
WIDEN TO 6 LANES |
17,790 |
| 13 |
ELLIS |
CR |
REPL BR |
87 |
| 14 |
FORT BEND |
US 59 |
GR, STRS, BS & SURF |
19,676 |
| 15 |
FORT BEND |
US 90A |
WIDEN TO 6 LANES WITH ASPHALT |
32,408 |
| 16 |
GALVESTON |
FM 646 |
GR, BASE, SURF, STRS |
2,479 |
| 17 |
GONZALEZ |
SH 97 |
ACP OVERLAY |
24,850 |
| 18 |
GRAYSON |
SH 91 |
EMERGENCY RELIEF PROJECT |
758 |
| 19 |
HARRIS |
CR |
ITS FOR HIGH DEMAND ARTERIAL STREET |
50 |
| 20 |
HARRISON |
IH 20 |
PLANE,CONC PVMT REP,ACP SF,PAV MRK |
41,686 |
| 21 |
HAYS |
IH 35 |
GRADING, BASE, PVMT, STRUCT & PVMT |
20,249 |
| 22 |
HILL |
FM 933 |
SEAL/OVLY |
6,632 |
| 23 |
HOUSTON |
FM 3151 |
RECONSTRUCT AND WIDEN PAVEMENT |
33,428 |
| 24 |
JASPER |
SH 62 |
GR, BS, OV, STRIPE |
28,629 |
| 25 |
JIM WELLS |
FM 665 |
MILL AND FILL |
5,254 |
| 26 |
KARNES |
FM 239 |
GRADE,BASE,SURF |
54,519 |
| 27 |
KAUFMAN |
FM 1388 |
GR, BASE, ACP OVERLAY, PVMT MKGS |
15,372 |
| 28 |
KING |
US 82 |
REHABILITATION OF EXISTING ROADWAY |
22,616 |
| 29 |
LIMESTONE |
FM 39 |
WDN, GR, BS, SURF & ADD SHLDRS |
16,347 |
| 30 |
LLANO |
SH 71 |
FULL DEPTH, LEVEL UP AND SEAL COAT |
14,025 |
| 31 |
LUBBOCK |
US 82 |
MILLING, GRADING, HMA |
15,120 |
| 32 |
MASON |
SH 29 |
LEVEL UP & SEAL COAT |
29,921 |
| 33 |
McLENNAN |
SH 6 |
CONSTR OP/RAMPS; EXTEND FRTG RDS |
51,880 |
| 34 |
McMULLEN |
SH 37 |
GRADE, BASE, STRUC, SURF, PAV_MRK |
140,037 |
| 35 |
MILAM |
FM 908 |
ROADWAY RESTORATION |
362 |
| 36 |
MILAM |
US 190 |
HMA OVERLAY |
32,117 |
| 37 |
MONTAGUE |
FM 1806 |
BRIDGE CONSTRUCTION |
378 |
| 38 |
MONTGOMERY |
FM 2978 |
GR, STRS, BASE AND PAVE |
14,555 |
| 39 |
NACOGDOCHES |
US 59 |
IMPROVE GUARDRAIL TO DES STANDARDS |
379 |
| 40 |
NUECES |
SH 361 |
GRADE,BASE,SURF,STRS |
36,059 |
| 41 |
SAN PATRICIO |
SH 359 |
MILL AND FILL |
7,451 |
| 42 |
SHELBY |
SH 71 |
SAFETY TREAT FIXED OBJECTS |
1,253 |
| 43 |
SMITH |
VA |
CURB RAMPS |
39 |
| 44 |
SMITH |
SS 248 |
ECONSTR GR,STRS,BS,C&G, SURF & PAV |
14,138 |
| 45 |
STERLING |
US 87 |
ACP OVERLAY |
58,844 |
| 46 |
TARRANT |
CS |
GR, BS, PAVEMENT AND STRIPING |
24,937 |
| 47 |
TOM GREEN |
US 67 |
ACP OVERLAY |
52,857 |
| 48 |
TRAVIS |
IH 35 |
BRIDGE REPLACEMENT |
4,724 |
| 49 |
WEBB |
SL 20 |
FLEX BSE, SURF, BRIDGE, PAV MRK ETC |
87,070 |
| 50 |
WHEELER |
US 83 |
WIDENING OF A NON-FREEWAY FACILITY |
40,664 |
| 51 |
WICHITA |
BU 2873 |
OVERLAY |
3,289 |
| 52 |
WILBARGER |
US 70 |
WIDENING OF A NON-FREEWAY FACILITY |
2,872 |
| 53 |
WILLIAMSON |
IH 35 |
NORTHBOUND OPERATIONAL IMPROVEMENTS |
41,803 |
|
|
|
|
|
|
|
|
TOTAL FOR DECEMBER |