TxDOT September 2014 Projects

Print Print this Article | Send to Colleague

The TxDOT highway letting is scheduled for September 9-10, 2014. Total tonnage of asphalt pavements being let is 644,781.


# COUNTY HWY
TYPE TONS
1 ANGELINA BU-59G REPLACE EXISTING RR STRUCTURE 5,325
2 BASTROP SH71 CONSTRUCT OVERPASS 38,484
3 BOWIE FM991 REPLACE BRIDGE AND APPROACHES 403
4 BURNET SH29 SEAL COAT,LEVEL UP IN BURNET AND LLANO 7,970
5 BURNET SH29 SEAL COAT AND THIN OVERLAY 2,707
6 BURNET RM2147 ADD LEFT TURN LANE 4,703
7 CALDWELL US183 SEAL & TOM OVERLAY 2,077
8 CALHOUN FM1289 REPLACE BRIDGE AND APPROACHES 2,222
9 CAMERON FM106 GR, STRS & SURF 27,069
10
CAMERON US281 REHAB & WIDEN EXIST ROADWAY SUPER 2 21,093
11
CAMERON FM803 REALIGN & WIDEN TO 4 LANES 24,654
12 DALLAS US175 GENERAL ROUTINE MAINTENANCE CONTRACT 11,000
13 DALLAS US175 GRADING, STRUCTURES, PVMT, SIGNS 29,696
14
DENTON FM544 REPL BR & APPR 37,345
15 DENTON FM1385 GR, BASE, PVMT, PVMT MKGS, SIGNS 51,855
16 EL PASO SS601 INTERSECTION IMPROVEMENTS 2,163
17 EL PASO IH10 REHAB AND OPERATIONAL IMPROVEMENTS 9,871
18 ELLIS FM66 REPLACE BRIDGE AND APPROACHES 496
19 FOARD US70 REHABILITATION OF EXISTING ROAD 23,138
20
GRAYSON SH5 MISCELLANEOUS CONSTRUCTION 11,367
21
HARRIS IH45 TRANSPORTATION MANAGEMENT SYSTEM 677
22
HARRIS SH146 MILL & O/L 806
23
HARRIS IH10 ACCEL/DECEL LANES WIDENING 674
24 HARRIS VA REP BR APPROACH SLABS 1,516
25 HARRISON CR REPLACE BRIDGE AND APPROACHES 670
26 HARRISON US59 IMPROVE TRAFFIC SIGNAL & LF TRN LAN 214
27 HARRISON IH20 CALLOUT MILL AND INLAY 11,001
28 HIDALGO US83 PAVEMENT REPAIRS 21,560
29 HOOD US377 HMAC OVERLAY 23,140
30 HOPKINS IH30 HAZARD ELIMINATION & SAFETY 163
31 HOUSTON SH7 GRADING, STRUT, BASE, HMAC SURFACE 22,273
32 KAUFMAN IH20 SEAL COAT, PVMT MKGS 6,944
33 KAUFMAN FM2728 GR, BASE, PVMT, PVMT MKGS, SIGNS 13,963
34 KENDALL IH10 BASE, GR, STR, SURF, SIGN & PAV MRK 11,246
35 KERR SH39 REPLACE NARROW BRIDGE & APPROACHES 374
36 LIBERTY SH61  WDN SUBGR, ACP, OCST 14,808
37 LIMESTONE SH7 REHAB RDWY 26,730
38 MONTGOMERY CR REPLACE BRIDGE AND APPROACHES 1,361
39 MONTGOMERY SH75 BASE REPAIR AND ACP O/L 9,622
40 MONTGOMERY SH105 BASE REPAIR AND ACP O/L 15,400
41 RAINS US69 MISCELLANEOUS CONSTRUCTION 17,696
42 ROCKWALL IH30 STR, GRD, BASE & CONC PAVT 32,810
43 SAN AUGUSTINE SH21 INTERSECTION IMPROVEMENTS 12,871
44 STARR FM755 REALIGN/W PARTIAL WIDENING TO 4 LNS 18,185
45 TRAVIS FM973 REHAB RDWY, ADD 6' SHOULDERS 13,280
46 WALKER SH150 GRADING, STRUCTURES, BASE AND SURF 33,603
47 WICHITA VA CONSTRUCT ADA CURB RAMPS   208
48 WISE FM2264 GRADING,BASE,DRAINAGE,STRUCTURE,PAV 11,938











TOTAL TONNAGE FOR SEPTEMBER LETTING 644,781



 
Ergon Asphalt & Emulsions, Inc.
Road Science, Division of ArrMaz
Martin Asphalt
Roadtec, Inc.
Lhoist North America
MeadWestvaco
Dedicated to Quality