Friday, January 31, 2014
Past Issues | www.texasasphalt.org | Printer-Friendly | Subscribe | Advertise

TxDOT February 2014 Projects

Print Print this Article | Send to Colleague

The TxDOT highway letting is scheduled for February 4-5, 2014. The total tonnage of asphalt pavements being let is        .


# COUNTY HWY
TYPE TONS
1 BASTROP SH304 FULL DEPTH REPAIR, LEVEL-UP & SPOT SEAL 5,495
2 BEXAR IH35 CALL OUT PAVEMENT REPAIR 16,229
3 BLANCO US281 MILL, SEAL AND OVERLAY 3,788
4 BRAZOS SH6 HMA OVERLAY 9,905
5 BRAZOS SH6 HMA MILL AND INLAY 1,403
6 CAMERON US77 OVERLAY MAIN LANES 19,858
7 CAMERON SH100 METAL BEAM GUARD FENCE INSTALLATION 40
8 CARSON IH40 REHAB EXISTING ROADWAY 27,811
9 COLLIN FM75 FLEX PVMT STRUCTURE REPAIR AND OVERLAY 1,726
10
COMAL BS46C BASE, GRAD, STR, SURF & PAV'T MRK 24,934
11
COOKE FM922 RESTORATION 40,679
12 COOKE VA RESTORATION 70
13 CULBERSON FM21858 RECYLED MATERIAL FOR SEAL COAT 6,897
14
DENTON FM720 GR, STRS & PVT 35,042
15 EL PASO SH20 INTERSECTION IMPROVEMENTS 36
16 FORT BEND IH10 GS, ROUNDABOUT, LOOP RDS, OVERLAY 16,762
17 GILLESPIE SH16 THIN OVERLAY 4,231
18 GRAYSON  SH91 CONSTRUCT LEFT TURN LANE 3,239
19 HARDIN SH326 ASPHALT PAVEMENT REPAIR 1,264
20
HARRIS SH6 ACCESS MANAGEMENT 783
21
HARRIS IH45 CONSTRUCT DIRECT CONNECTOR 3,212
22
HAYS SH21 CONSTR LEFT TURN LANE ON SH 21 NB 1,812
23
HOPKINS CR BRIDGE REPLACEMENT 157
24 HOUSTON US287 CONSTRUCTION OF STORM SEWER 675
25 JASPER FM1007 ADDING OR WIDENING PAVEMENT 260
26 JASPER FM252 HMA OVERLAY 6,186
27 JEFFERSON SP215 FDR, BS, MILL, OVERLAY 2,146
28 JOHNSON FM917 HMAC OVERLAY 18,493
29 LIBERTY LP573 ACP 13,048
30 LUBBOCK US84 UTBHMWC AND PAVEMENT MARKINGS 10,183
31 LUBBOCK SH114  ACCESS IMPROVEMENTS 2,755
32 MONTGOMERY US59 ASPHALT PAVEMENT REPAIR 442
33 NEWTON SH87 PVMT RPR, OCST, ACP 18,259
34 OLDHAM IH40 OVERLAY 51,597
35 ORANGE IH10 GR, BS, PVMT & STR 64,000
36 PANOLA SH149 CMT TRT EXIST MTL, OCST, ACP, & PM 13,053
37 SAN JACINTO US59 ADD SB FRTG RD & RECONST MAIN LANES 14,779
38 SAN PATRCIO IH37 MILL, SEAL AND OVERLAY 72,623
39 SCURRY US84 EXC,EMB,FL BS,PLANE,MBGF,ACP 39,555
40 SHELBY US84 RECONSTRUCT PAVEMENT 21,858
41 TARRANT IH30 HMAC OVERLAY 56,517
42 TOM GREEN US87 ACP OVERLAY 19,502
43 TYLER US69 BRIDGE JOINT MAINTENANCE 507
44 VAN ZANDT SH198 SBGR WDN,ACP BS,OCST,STRS,PFL PV MK 27,635
45 VICTORIA US59 ACP OVERLAY 13,528
46 WALKER IH45 PERFORMANCE-BASED TOTAL MAINT. OF IH 45 12,000
47 WALKER SH30 HMA MILL AND INLAY 1,403
48 WEBB FM1472 MILL, ACP OVERLAY, SIGNS, PAV MKS 66,430
49 WHARTON FM1301 ACP OVERLAY 18,840
50 WILLIAMSON FM685 RECONSTRUCT TO 4-LANE DIVIDED RDWY 26,238



TOTALS SCHEDULED FOR FEBRUARY 818,155



 
Ergon Asphalt & Emulsions, Inc.
Martin Asphalt
Roadtec, Inc.
Lhoist North America
MeadWestvaco
Dedicated to Quality
Asphalt: Smooth | Durable | Quiet | Safe