Tuesday, October 02, 2012
Past Issues | www.texasasphalt.org | Printer-Friendly | Subscribe | Advertise

TxDOT October 2012 Tonnage

Print Print this Article | Send to Colleague

The TxDOT highway letting is scheduled for October 9th & 10th. The total tonnage of asphalt pavements being let is 996,022.


# COUNTY HWY
TYPE TONS
1 ANGELINA
SP 339
RESURFACE AND WIDEN FOR CTWLTL WITH C&G SECTION
13,159
2 AUSTIN
FM 331
REPLACE BRIDGE AND APPROACHES
256
3 BEE
SH 72
REHAB ROADWAY AND ADD PASSING LANES
79,919
4
BELL SH 317 WIDEN FROM TWO TO FOUR LANES WITH RAISED MEDIAN
13,363
5
BELL
US 190
WIDEN FROM FOUR TO SIX LANES AND RESURFACE
220,662
6
BRAZORIA
SH 288
CONSTRUCT TURNAROUND
74
7
BRAZORIA
BS 288B
REPLACE BRIDGE AND APPROACHES
7,104
8
BRAZORIA
BS 35-C
SEAL COAT, ACP OVERLAY, & PVMNT MRKS
9,872
9
BURNET
SH 71, ETC
CONSTRUCT CONTINOUS LEFT TURN LANE
2,858
10
CHAMBERS
LP 207
OVERLAY EXISTING ROADWAY
1,292
11
COMAL
FM 306
WIDEN TO PROVIDE TURN LANE
11,591
12 DALLAS
US 67
FULL DEPTH REPAIR CONC PVMT & HMAC OVERLAY
2,359
13 DALLAS
IH 30
CONSTRUCT 2 LANE EASTBOUND FRONTAGE ROAD
3,672
14
DALLAS
IH 35E
FULL DEPTH REPAIR AND ACP OVERLAY OF FRONTAGE RDS
12,344
15
DEWITT
SH 72
ACP OVERLAY
12,451
16
DIMMIT
SH 85, ETC
OVERLAY
58,939
17
EASTLAND
IH 20
CONSTRUCT TWO SAFETY REST AREAS
10,362
18
ECTOR
IH 20
PAVEMENT REPAIR
16,533
19
EL PASO
IH 10
INTCHG IMPRV INCL CNSTR DIRECT CONNECT
16,669
20
ELLIS
IH 35E
REHABILITATE EXISTING SB AND NB FRONTAGE ROADS
45,328
21
FORT BEND
US 59
GENERAL ROUTINE MAINTENANCE OF US 59
5
22
HARDIN
FM 770
OVERLAY EXISTING ROADWAY
6,651
23
HARDIN
SH 326
INLET AND CULVERT REPAIRS
3
24
HARRIS
IH 10
INTERSECTION IMPROVEMENTS
5,354
25
HARRIS
IH 610
RECONST US290/IH610 INCLDG IH10 TO US290 OUT DCS
21,097
26
HARRIS
FM 529
GR, STRS, BASE AND SURF
11,076
27
HAYS
RM 967
CONSTRUCT TURN LANES
1,461
28
HIDALGO
US 83
ACP OVERLAY
18,041
29
HOUSTON
SH 7
REALIGN INTERSECTION
4,918
30
KNOX
US 82
ASPHLTIC CONCRETE OVERLAY
11,605
31
LASALLE
IH 35, ETC
OVERLAY
80,667
32
LIBERTY
FM 563
PROVIDE ADDITIONAL PAVED SURFACE WIDTH
30,623
33
MIDLAND
SH 158
REHABILITATION OF EXISTING ROAD
64,595
34
MONTGOMERY
SH 105
WIDEN WB FROM 2 TO 3 LANES
271
35
MONTGOMERY, ETC
SH 105
TURN LNS,PASS LNS, BS REP,OCST,O/L
64,811
36
NUECES
US 77
MILL, UNDERSEAL & INLAY
5,700
37
POTTER
VA
STATEWIDE CURB RAMP PROGRAM
280
38
RANDALL
US 60
ACP OVERLAY
84,837
39
SUTTON
SL 467, ETC
REHABILITATE TOWN SECTION
10,247
40
TRAVIS
US 290
PROVIDE SIGNALIZED INTERSECTIONS
10,274
41
WOOD
SH 154
ADD SHOULDERS AND REHABILITATE ROADWAY
24,699






TOTAL

 996,022
 
Ergon Asphalt & Emulsions, Inc.
Crafco, Inc.
Roadtec, Inc.
Martin Asphalt
Lhoist North America
MeadWestvaco
Kirby-Smith Machinery, Inc.
Dedicated to Quality
Asphalt: Smooth | Durable | Quiet | Safe