The TxDOT highway letting is scheduled for September 6th & 7th. The total tonnage of asphalt pavements being let is 1,674,906.
| # |
COUNTY |
HWY |
TYPE |
TONS |
| 1 |
AUSTIN
|
SH 36
|
CONSTRUCT AUXILIARY LANES
|
120,924
|
| 2 |
BEXAR
|
IH 410
|
RELOCATE ENTRANCE & EXIT RAMPS BETWEEN RR OVERPASS
|
5,277
|
| 3 |
BRAZORIA
|
CR
|
RECONSTRUCT 2 LN RDWAY
|
17,474
|
| 4 |
BRAZORIA
|
SH 35
|
BASE REPAIR AND INLAY
|
2,054
|
| 5 |
BRAZOS
|
SH 21
|
WIDEN NON-FREEWAY FACILITY
|
59,341
|
| 6 |
BRAZOS
|
FM 2818
|
OVERLAY
|
7,294
|
7
|
BROOKS
|
US 281
|
CONSTRUCT OVERPASS
|
33,052
|
8
|
CALHOUN
|
FM 1289
|
SET FIXED OBJECTS AND CONSTRUCT SHOULDERS
|
318
|
9
|
CAMERON
|
US 77
|
UPGD RMPS & CNVRT FR RDS TO 1-WAY
|
19,898
|
10
|
COLLIN
|
US 75
|
RECONSTRUCT AND WIDEN 4 LANE TO 6 LANES
|
106,180
|
| 11 |
COLLINGSWORTH
|
SH 203
|
REHABILITATION OF A BRIDGE FACILITY
|
102
|
| 12 |
COMAL
|
BS 46-C
|
REPLACE RR UNDERPASS & WIDEN TO 4 LANE UNDIVIDED
|
8,029
|
| 13 |
COMAL
|
FM 306
|
EXPAND 2 TO 4 LANE DIVIDED
|
78,533
|
| 14 |
COMAL
|
FM 3009
|
RECONFIGURE INTERSECTION
|
7,223
|
| 15 |
COTTLE
|
FM 1037
|
WIDENING OF NON FREEWAY FACILITY
|
1,515
|
| 16 |
DALLAS
|
IH 35E
|
GENERAL ROUTINE MAINTENANCE
|
8,750
|
| 17 |
DALLAS
|
IH 45
|
GENERAL ROUTINE MAINTENANCE
|
22,000
|
| 18 |
DALLAS
|
IH 35E
|
FULL DEPTH REPAIR OF FRONTAGE ROADS AND RAMPS
|
65
|
| 19 |
DENTON
|
FM 407
|
REPLACE BRIDGE AND APPROACHES
|
815
|
20
|
DIMMIT, ETC
|
US 83
|
GRADE, BASE, SURF, STR, STRIP & SIGN
|
51,628
|
21
|
EL PASO
|
IH 10
|
CONSTRUCT RAMPS ON I-10 NORTH
|
3,876
|
22
|
EL PASO
|
SP 276
|
GRADE,STRUCT,SIGN,DELIN,ACP
|
18,342
|
| 23 |
ELLIS
|
FM 85
|
BASE REPAIR
|
3,000
|
| 24 |
ERATH
|
SH 267
|
RECONSTRUCT US 67 0N ALT. RT N & W OF DUBLIN
|
50,693
|
| 25 |
FANNIN
|
SH 121
|
UPGRADE TO 5 LANE ROADWAY WITH SHOULDERS
|
27,775
|
| 26 |
FREESTONE
|
FM 1365
|
ROADWAY RESTORATION
|
4,574
|
| 27 |
GONZALES
|
UA 90
|
ACP OVERLAY
|
29.993
|
| 28 |
GRAYSON, ETC
|
US 82
|
WIDEN FROM 2-LANE TO 4-LANE DIVIDED
|
153,137
|
| 29 |
GUADALUPE, ETC
|
IH 35
|
GR, BS, STR, SURF, OVERLAY
|
101,454
|
30
|
GUADALUPE, ETC
|
SH 123
|
WIDEN ROADWAY TO PROVIDE PASSING LANES
|
46,272
|
| 31 |
HARRIS
|
BU 90-U
|
REPLACE BRIDGE AND APPROACHES
|
1,456
|
| 32 |
HARRIS
|
SH 225
|
FULL DEPTH REPAIR, MILLING, CURB REPAIR & ACP O/L
|
12,623
|
| 33 |
HARRIS
|
SH 288
|
CONSTRUCT TWO LANE DIRECT CONNECTOR
|
428
|
| 34 |
HARRIS
|
FM 529
|
GR, STRS, BASE AND SURF
|
11,076
|
| 35 |
HARRIS
|
FM 1960
|
TRAFFIC SIGNAL
|
1,380
|
| 36 |
HARRIS
|
FM 1942
|
INST. LFT TURN LN. ON FM 1942 EB TO BOHEMIAN RD.
|
1,207
|
| 37 |
HARRIS
|
IH 10
|
INTERSECTION IMPROVEMENTS
|
5,354
|
| 38 |
HARTLEY, ETC
|
US 87
|
REHAB EXIST LANES & PASSING LANES
|
134,143
|
| 39 |
HAYS
|
LP 82
|
REPLACE BRIDGE CLASS CULVERT
|
640
|
| 40 |
HAYS
|
RM 12
|
INTERSECTION IMPROVEMENTS
|
853
|
| 41 |
HENDERSON
|
SH 19
|
WIDEN 2 LN ROADWAY TO SUPER-2 (3-LANE) CRITERIA
|
23,253
|
| 42 |
HIDALGO
|
FM 1926
|
CONST RIGHT TURN LANES (NB & WB)
|
179
|
| 43 |
HIDALGO
|
US 281
|
RECONST MAIN LANES AND ADD FRONTAGE ROADS
|
62,120
|
| 44 |
HOOD
|
US 377
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR
|
3,000
|
| 45 |
JOHNSON
|
SH 174
|
ASPHALT & INLAY, C.MEDIAN, MAIN LANES & SHLDRS
|
20,548
|
| 46 |
JOHNSON
|
IH 35W
|
MILL AND HMAC OVERLAY
|
52,881
|
| 47 |
JOHNSON
|
FM 2135
|
ADD PAVED SURFACE WIDTH,2'SHOULDERS,OVERLAY
|
24,760
|
| 48 |
KAUFMAN
|
SH 34
|
REMOVE & REPLACE RIPRAP & WINGWALL
|
3
|
| 49 |
KERR
|
SH 39
|
UPGRADE TO 2 LANE WITH CONTIUOUS LEFT TURN LANE
|
12,523
|
| 50 |
KNOX
|
SH 6
|
REPLACEMENT OF AN EXISTING BRIDGE FACILITY
|
8,972
|
| 51 |
LAMAR
|
US 271
|
REHABILITATION OF EXISTING ROAD
|
22,385
|
| 52 |
LASALLE, ETC
|
SH 97, ETC
|
OVERLAY
|
50,251
|
| 53 |
LIVE OAK, ETC
|
FM 624
|
GRADE,BASE,SURF,STRS
|
908
|
| 54 |
MEDINA
|
SH 173
|
REHAB & WIDEN NARROW PVMT TO ADD SHOULDERS
|
5,585
|
| 55 |
MILAM
|
FM 486
|
GR, STRS, BASE AND SURFACE
|
76
|
| 56 |
MONTGOMERY
|
CS
|
GR, STRS, BASE AND PAVE
|
613
|
| 57 |
MONTGOMERY, ETC
|
FM 2978, ETC
|
GR, STRS, BASE AND PAVE
|
2,039
|
| 58 |
MOTLEY
|
FM 94
|
NEW BASE, ACP AND STRUCTURES
|
13,682
|
| 59 |
NACOGDOCHES
|
SH 7
|
REHAB EXISTING RDWY & ADD PV SHLDRS/PASSING LANES
|
9,534
|
| 60 |
NUECES
|
SH 357
|
MILL, UNDERSEAL AND INLAY
|
730
|
| 61 |
PARKER
|
FM 1884
|
WIDEN EXISTING RDWAY ADD SHOULDERS
|
25,744
|
| 62 |
RED RIVER
|
FM 411
|
BASE REHABILITATION
|
148
|
| 63 |
RED RIVER
|
SH 37
|
REPLACE BRIDGE
|
14,289
|
| 64 |
ROCKWALL
|
SH 205
|
REPLACE BRIDGES AND APPROACHES
|
1,185
|
| 65 |
ROCKWALL
|
FM 550
|
REPLACE BRIDGES AND APPROACHES
|
4,053
|
| 66 |
SAN PATRICIO
|
FM 3239, ETC
|
DRADE, BASE, SURF & STRTS
|
10,607
|
| 67 |
SHELBY
|
US 84
|
RECONSTRUCT EXISTING PAVEMENT
|
36,395
|
| 68 |
STARR
|
FM 755
|
OVERLAY
|
30,810
|
| 69 |
TARRANT
|
FM 730
|
MILL & OVERLAY
|
17,683
|
| 70 |
TOM GREEN
|
US 67
|
REPLACE BRIDGES
|
3,160
|
| 71 |
TRAVIS
|
LP 1
|
WIDEN NBFR & INSTALL AUXILIARY LANE
|
1,116
|
| 72 |
UVALDE
|
FM 1049
|
REHAB AND WIDEN NARROW ROADWAY TO ADD SHOULDERS
|
80
|
| 73 |
VAN ZANDT
|
SH 64
|
WIDEN 2-LN ROADWAY TO SUPER-2 (3-LN) CRITERIA
|
32,457
|
| 74 |
WALKER
|
SH 75
|
UPGRADE INTERCHANGE TO STANDARDS
|
15,485
|
| 75 |
WALLER
|
FM 362, ETC
|
INSTALL LEFT TURN LANES
|
2,739
|
| 76 |
WEBB
|
SL 20
|
GRADING,BASE,STRUCTURES,& SURFACE
|
15,898
|
| 77 |
WILBARGER
|
FM 3207
|
PROVIDE ADDITIONAL PAVED SURFACE WIDTH
|
15,096
|
| 78 |
WOOD
|
SH 154
|
REPLACE BRIDGE & APPROACHES
|
5,134
|
|
|
|
|
|
|
TOTAL |
|
|
1,674,906 |
|
|