TxDOT - April 2012 Tonnage
Print this Article | Send to Colleague
The TxDOT highway letting is scheduled for April 3rd & 4th. The total tonnage of hot mix being let is 584,068.
| NUMBER |
COUNTY |
|
TYPE |
TONS |
| 1 |
AUSTIN
|
SH 36
|
REHABILITATE ROADWAY
|
17,504
|
| 2 |
BASTROP
|
PW
|
RECONSTRUCT ENTRANCE ROAD & PARKING
|
697
|
| 3 |
BEE
|
SH0202
|
HOTMIX OVERLAY
|
5,025
|
| 4 |
BEXAR
|
IH 37
|
MILL, BASE REPAIR, SC, OVERLAY, SIGNS & PAV MRK
|
22,655
|
| 5 |
BEXAR
|
IH0037
|
SLOPE REPAIR
|
669
|
| 6 |
BEXAR
|
IH0035
|
PAVEMENT REPAIR
|
28,312
|
| 7 |
BRAZORIA
|
VA, ETC
|
ACP OVERLAY
|
51,005
|
| 8 |
BRAZORIA
|
SH 35
|
SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS
|
39,128
|
| 9 |
BRAZORIA
|
CS
|
REPLACE BRIDGE AND APPROACHES.
|
517
|
| 10 |
BRAZORIA
|
SH 288
|
TURNAROUND AND RIGHT TURN LN
|
111
|
| 11 |
BRAZOS
|
SH0030
|
PERMEABLE FRICTION COURSE (PFC) OVERLAY
|
1,385
|
| 12 |
BURLESON
|
FM0975
|
MILL AND INLAY
|
1,361
|
| 13 |
CALDWELL
|
FM0672
|
ACP T "D" LEVEL-UP
|
30,087
|
| 14 |
CHEROKEE
|
US0175
|
WIDENING FOR TURNING LANE
|
2,535
|
| 15 |
COLLIN
|
SH 78
|
WIDEN FROM 2 LANE RURAL TO 6 LANE DIVIDED URBAN
|
38,228
|
| 16 |
COMAL
|
FM 482
|
GR, BS, STR, SURF, & PAV MRK
|
45,353
|
| 17 |
COMAL
|
B10035H
|
1.5" MILL, SEAL, OVERLAY
|
5,740
|
| 18 |
DALLAS
|
SH 180
|
REPLACE BRIDGES AND APPROACHES
|
766
|
| 19 |
DALLAS
|
CS
|
REPLACE BRIDGE AND APPROACHES
|
218
|
| 20 |
DALLAS
|
LP 12
|
PLANE, FDR CONC PVMT REPAIR AND OVERLAY
|
33,433
|
| 21 |
DENTON
|
IH 35E, ETC.
|
FULL DEPTH PAVEMENT REPAIR/OVERLAY FRNTG ROADS
|
10
|
| 22 |
DEWITT
|
FM0240
|
ON CALL PAVEMENT REPAIR
|
4,928
|
| 23 |
DEWITT
|
VA
|
CONSTRUCT CURB RAMPS
|
151
|
| 24 |
FAYETTE
|
US 77
|
ACP OVERLAY
|
11,929
|
| 25 |
GALVESTON
|
FM 518
|
BASE REPAIR, MILLING & ACP OVERLAY
|
5,763
|
| 26 |
GALVESTON
|
SH 96
|
MILL,SEAL COAT,BASE REPAIR,ACP OVERLAY
|
28,072
|
| 27 |
GALVESTON
|
FM 1765
|
BASE REPAIR, 1 1/2" ASPHALT OVERLAY,PAV. MARKINGS
|
4,075
|
| 28 |
GONZALES
|
FM0443
|
PAVEMENT REPAIR (ON-CALL)
|
4,928
|
| 29 |
GRAYSON
|
US0082
|
MILL & INLAY
|
3,174
|
| 30 |
GRAYSON
|
FM 131, ETC
|
CONSTRUCT TURN LANES
|
2,306
|
| 31 |
GRAYSON
|
SH 91
|
OVERLAY EXISTING PAVEMEMNT
|
22,081
|
| 32 |
GREGG
|
IH0020
|
BRIDGE RAIL AND MBGF
|
35
|
| 33 |
GRIMES
|
SH 6
|
CONVERT TO ONE-WAY FRONTAGE ROADS
|
4,552
|
| 34 |
HARDIN
|
US0069
|
DRIVEWAY WIDENING
|
72
|
| 35 |
HARRISON
|
CR
|
REHABILITATE BRIDGE AND APPROACHES
|
270
|
| 36 |
HARRISON
|
IH0020
|
CALLOUT MILL AND INLAY
|
24,209
|
| 37 |
HAYS
|
CR
|
REPLACE BRIDGE & APPROACHES
|
191
|
| 38 |
HOPKINS
|
IH 30
|
MILL, OVERLAY AND PFC OVERLAY
|
20,590
|
| 39 |
HUNT
|
IH0030
|
MILL & INLAY
|
1,283
|
| 40 |
JASPER
|
US0190
|
MILL AND OVERLAY EXISTING ROADWAY
|
3,780
|
| 41 |
JASPER
|
PW
|
PAVE LEVEE ROADS WITHIN FISH HATCHERY (PHASE II)
|
1,275
|
| 42 |
JIM WELLS
|
FM1554
|
HMACP OVERLAY
|
2,531
|
| 43 |
JOHNSON
|
BU 67-M
|
MILL, OVERLAY AND STRIPING
|
17,316
|
| 44 |
JOHNSON
|
BU 67-M
|
HMAC OVERLAY
|
4,370
|
| 45 |
KLEBERG
|
US 77
|
CONSTRUCT MAINLANES AND OVERPASS AT CAESAR AVE.
|
40,387
|
| 46 |
MCLENNAN
|
SH0006
|
INSTALL PIPE UNDERDRAINS, SPOT LEVEL-UP, SEAL COAT
|
4,500
|
| 47 |
MEDINA
|
US0090
|
INSTALLATION OF MEDIAN CURB ISLAND
|
266
|
| 48 |
NAVARRO
|
BI0045F
|
REMOVE AND REPLACE TRAVEL LANES
|
3,612
|
| 49 |
NUECES
|
SH0358
|
MILL & INLAY
|
1,418
|
| 50 |
ORANGE
|
CR
|
CONSTRUCT NEW ROADWAY AND RAILROAD GRADE CROSSING
|
18,462
|
| 51 |
PARKER
|
CR
|
REPLACE BRIDGE AND APPROACHES
|
1,050
|
| 52 |
REFUGIO
|
US0077
|
MILL & OVERLAY
|
8565 |
53
|
SAN PATRICIO
|
US0181
|
MILL & OVERLAY
|
5,419
|
54
|
SAN PATRICIO
|
FM0666
|
MILL & OVERLAY
|
2,726
|
55
|
TARRANT
|
IH0030
|
SPOT MILL AND FILL
|
1,094
|
56
|
WALKER
|
IH0045
|
HMA MILL/INLAY AND OVERLAY
|
1,985
|
57
|
WALLER
|
CR
|
REPLACE BRIDGE AND APPROACHES
|
491
|
58
|
WEBB
|
SL 20
|
GRAD, BASE, SURF, STRIPING SIGNING
|
1,104
|
59
|
WICHITA, ETC
|
CR
|
REPLACE BRIDGE AND APPROACHES
|
365
|
60
|
WOOD
|
US0080
|
INLET AND CURB & GUTTER REPAIR
|
4
|
|
|
|
|
|
|
TOTAL
|
|
|
|
|
|