The TxDOT highway letting is scheduled for March 6th & 7th. The total tonnage of hot mix being let is 622,538.

NUMBER COUNTY HWY TYPE TONS
1 ARMSTRONG
VA
CONSTRUCTION OF VISITOR'S CENTER
518
2 BASTROP 
SH 21
PAVEMENT REPAIR, MILL, SEAL & OVERLAY
36,554
3 BEE
US0181
HMAC OVERLAY
10,235
4 BRAZORIA
SH0288
COPING & SLOPE REPAIR 104
5 CARSON, ETC.
IH 40
REHAB EXISTING ROADWAY
29,472
6 CHEROKEE
CR
REPLACE BRIDGE & APPROACHES
420
7 COOKE
IH0035
BRIDGE REHABILITATION
23
8 DALLAS
LP 12
RESURFACE HIGHWAY
24,673
9 DAWSON
SH0137
MILL & INLAY OF HOT MIX & SEAL COAT
390
10 DONLEY
US0287
OVERLAY
 31,833
11 ECTOR
VA
ADA RAMP IMPROVEMENTS
27
12 ELLIS
US 287
REPAIR & OVERLAY
74,849
13 FAYETTE
US 90
REPLACE BRIDGE & APPROACHES
3,061
14 FAYETTE
US 77 
ADD PASSING LANE FOR SUPER 2 HWY
42,127
15 FREESTONE
FM0553
ROADWAY RESTORATION
4,040
16 GALVESTON
LP0197
BASE REPAIR & ACP OVERLAY
8,538
17 GRAYSON
FM0120
ADD LEFT TURN LANE/UPGRADE SIGNAL
945
18 GREGG
LP0281 
PFC OVERLAY & PAVEMENT MARKINGS
8,514
19 GREGG
SP0063  
PFC OVERLAY
7,776
20 HARDIN
SH0105
MILL & OVERLAY PFC REPAIR AREAS
212
21 HARRIS
CS
PEDESTRIAN & BICYCLE TRAIL
 816
22 HAYS
RM 1826
ADD TURN LANE & SHOULDERS
2,089
23 HILL
SH0031
MISCELLANEOUS BRIDGE REPAIR
15
24 HOPKINS
IH 30
REPLACE BRIDGE & APPROACHES
1,617
25 JEFFERSON
VA
MILLING & INLAY AT RAILROAD CROSSINGS
2,822
26 JOHNSON
FM 2738 
GRADING, BASE & PAVEMENT
21,581
27 KAUFMAN
CR
REPLACE BRIDGES & APPROACHES
263
28 KERR
FM 1340
WIDEN NARROW ROADWAY TO ADD SHOULDERS
 5,285
29 KERR
FM 1341
GRADING, BASE, SURF, PAV MRK, SIGNS
1,206
30 LUBBOCK
VA
PAVEMENT REPAIR
13,259
31 LUBBOCK
US0084  
MILL & INLAY
3,287
32 MCLENNAN, ETC.
US 84, ETC.
CONSTRUCT RT TURN LANE AT SW QUADRANT ETC. 8,543
33 MEDINA
US0090
INSTALLATION OF MEDIAN CURB ISLAND
266
34 MONTAGUE
US 81
THIN BONDED CONCRETE OVERLAY
15,997
35 MONTAGUE
US 81, ETC.
OVERLAY
12,528
36 NACOGDOCHES
FM 226
RECONSTRUCT EXISTING PAVEMENT
 287
37 NOLAN
IH 20
MILLING & 2" OVERLAY
6,062
38 PARKER
FM 51
MILL & OVERLAY  9,510
39 POTTER
 US 87
REPLACE BRIDGE & APPROACHES
4,160
40 SABINE
FM2426
MILL & INLAY
25,003
41 SHELBY
US 84, ETC.
REHABILITATE PAVEMENT & ADD LEFT TURN LANE
28,441
42 SMITH
US0271 
ROADWAY REHAB
1,945
43 TARRANT 
VA
CONSTRUCT CURB RAMPS
36
44 TARRANT
SH0183
PLANING & OVERLAY
27,015
45 TARRANT
FM0157
PLANING & OVERLAY
20,513
46 TARRANT
SH0199
FLEXIBLE PAVEMENT STRUCTURE REPAIR
5,000
47 TARRANT
BF1187C 
HMAC OVERLAY
7,103
48 TAYLOR 
IH 20  
ACP OVERLAY
19,521
49 TAYLOR, ETC.
FM 600
ACP LEVEL-UP & OVERLAY
7,937
50 TOM GREEN
CS
CONSTRUCT SIDEWALKS AND CROSSWALKS
70
51 TYLER
US0069 
OVERLAY ROADWAY & BRIDGE JOINT REPAIR
7,594
52 TYLER
US0287 
CULVERT EXTENSION/REPAIR & CURB REPAIR
1
53
VAN ZANDT
FM 17
SBGRD WDN, CMT TRT SBGRD, FL BS, TCST, STR EXTN, PM
 1,696
54
VAN ZANDT
FM 2339
GRADING, STRS, BASE, SURF TRT, MBGF, PV MK
509
55
WASHINGTON
US0290 
ROADWAY RESTORATION
2,213
56
WHEELER
US 83
REHABILITATION OF EXISTING ROADWAY
13,390
57
WICHITA
US 287
SEAL COAT & HEAVY OVERLAY
29,224
58
WICHITA
SH0079
HOTMIX OVERLAY
7,735
59
WILLIAMSON 
SH 95
RESTORE & RESTRIPE TO SUPER 2
8,590
60
WOOD
FM 778
SUBGRD WDN, HOTMIX BASE, OCST, STRS, PVT MRK
15,168






TOTAL


622,538
 