TxDOT - May 2011 Tonnage

Print Print this Article | Send to Colleague

The TxDOT highway letting is scheduled for May 3 & 4. The total tonnage of hot mix being let is 645,427.

#

County

Hwy

Description

Tonnage

1

Angelina

VA Concrete joint and pavement repairs

1,308

2

Aransas

SH 35

Replace existing bridge & rewk apro

7,657

3

Bastrop

PW

Repair/reconstruct roads & parking

 9,396

4

Bexar

VA Construct curb ramps

 30

5

Bexar

IH 35 Pavement repair

 38,797

6

Blanco

US 281

Replace bridge & approaches

 2,034

7

Bowie

US 67, Etc. Install left turn lanes

338

8

Brazos

US 190

Construction of exit ramp

 1,239

9

Brazos, Etc

SH 21

Grading, structures, base & surf

 26,969

10

Burnet

SH 29 Level up & seal coat

 17,784

11

Coleman

US 67 Mill & inlay (non-site-specific)(will call)

 10,165

12

Collin FM 545 Reconstruct roadway & replace bridge

 2,553

13 Coryell, Etc. US 290 Cnstr intchgs & cntng rdwys

65,233

14

Dallam SS 17 New location 2 lane rdwy

 220

15

Dallas IH 30 Plan, ACP, overlay, shoulder repair, pvmt mrks

 25,117

16

Dallas SP 244 Resurf hwy with FDCPR, novachip, & pvmt mkgs

 5,865

17

Ellis

FM 983

Replace bridge & approaches

 1,394

18

Freestone IH 45 Shoulder widening

 222

19

Frio IH 35 Relocate existing ramp & construct NB frontage rd

 3,077

20

Grayson US 75 Whitetopping

 147

21

Harris IH 610 Reconstruct US 290/IH 610 interchange

 51,711

22

Harris IH 10 Repair slope failure

 1

23

Harris IH 45 GR, STRS, base, & pave

 122,521

24

Hays

RM 967 One course surface treatment

 1,000

25

Hays

RM 150 Seal coat & partial overlay

 14,142

26

Hays

SH 21 Intersection & safety improvements

 3,305

27

Hidalgo

US 281, Etc. Overlay (main lanes)

 29,870

28

Hidalgo

US 281 Overlay

13,516

29

Hidalgo

FM 1426 Rehab NB outside ln

 3,241

30

Hill

IH 35 Construction of a new safety rest area

 17,959

31

Hood

FM 2580

Replace bridge & approaches

 514

32

Hunt

FM 1903 Construct concrete intersection

 495

33

Hunt

PW TCST, HMAC BS, curb & gutter, sdwlk, pv mk

 325

34

Hunt

SP 302, Etc. Overlay

 3,473

35

Jackson

FM 1593 Widen roadway to add left turn lane

 1,286

36

Karnes

SH 80 Overlay roadway & backfill edges

 8,350

37

Lee, Etc.

SH 21, Etc. Adding shoulders, pavement repair & seal coat

23,380

38

Leon

IH 45 Roadway restoration

 5,022

39

McLennan

SH 6 Repair of base failures

 8,589

40

Milam

US 190 Plane, inlay & seal of existing roadway

 2,357

41 Montague FM 922 Asphalt concrete pavement overlay

4,693

42

Navarro, Etc.

VA Upgrd select intersections to current ADA std

 511

43 

Nueces

SH 358

Mill & overlay

 3,940

44

Nueces

SH 286 Mill & overlay

 2,245

45

Palo Pinto

SH 254

Gr, bs & pavement

 9,155

46

Palo Pinto US 180 Mill & overlay

5,123

47

Parker

US 180 Flexible pavement structure repair

1,891

48

Rusk

FM 1251 Restoration of existing road

223

49

Shelby FM 2026 Replace bridge & approaches

4

50 Shelby FM 417 Bridge replacement

620

51 Smith SH 110 Overlay

 4,217

52 Tarrant BF 1187C Replace bridge

892

53 Tarrant SH 360 Improve traf signal & lengthen left turn lane

246

54 Tarrant SH 26 HMAC overlay

10,216

55 Travis IH 35 Planing, seal coat, ACP overlay & MBGF

3,895

56 Travis RM 620 Install advanced warning, safety lighting, etc

3,176

57 Travis SH 71 Install center turn lane & shoulders

25,540

58 Travis US 290 Install center turn lane & pave shoulders

8,340

59 Upshur FM 1404 Improve intersection

288

60 Victoria BU 77S Asphaltic concrete pavement surfacing

6,266

61 Waller FM 362 ACP o/l, base repair & widen shoulders

22,790

62 Williamson US 79. Etc. Extend ltl & install signal

1,554

         
     TOTAL  

 645,280

         
       
 
Ergon Asphalt & Emulsions, Inc.
Doggett Machinery Services
Roadtec, Inc.
Lhoist North America
MeadWestvaco
Dedicated to Quality
Asphalt: Smooth | Durable | Quiet | Safe