Volunteers for the following working groups of Technical Information Papers (TIPs) are needed.

All Working Groups of TIPs require a minimum of 3 TAPPI members from 3 different companies in order to review a TIP.

WGC needed
 
0402-03 Guidelines for corrosion resistant weld metal overlay of digester vessels in alkaline pulping service
0410-05 Head of stock behind slice (head/jet and slice flow rate relationships)
0410-08 Control of stock jump on a fourdrinier wire
0410-14 Generalized method for determining the pipe friction loss of flowing pulp suspensions
0410-15 Optimum consistency for pumping pulp
 
WG Members needed
 
0304-23 Statistical process control pin adhesion.
 
If you would like to join a Working Group of a TIP, please write to tip@tappi.org for more information.