|
Print this article | Send to Colleague
Volunteers for the following working groups of Technical Information Papers (TIPs) are needed.All Working Groups of TIPs require a minimum of 3 TAPPI members from 3 different companies in order to review a TIP. The following TIPs do not have an assigned Working Group Chair (WGC) to initiate the review:
Working Group Chairs Needed: TIP 0404-20 Physical characterization of press fabrics: basis weight, air permeability, and pressure uniformity TIP 0404-46 Techniques for nip impressions TIP 0404-47 Paper machine performance guidelines TIP 0404-58 Steam shower applications in the forming and press section TIP 0404-67 Paper machine doctor recommendations TIP 0416-03 Water quality and monitoring requirements for paper mill boilers operating with high purity feedwater TIP 0502-14 Forming section monitoring TIP 0502-20 Catalog of Stock Preparation Pilot Plants
Working Group Members Needed: TIP 0404-20 Physical characterization of press fabrics: basis weight, air permeability, and pressure uniformity TIP 0404-31 Recommended dryer differential pressures. TIP 0404-35 Application of dryer bars TIP 0404-46 Techniques for nip impressions TIP 0404-47 Paper machine performance guidelines TIP 0404-58 Steam shower applications in the forming and press section TIP 0404-67 Paper machine doctor recommendations TIP 0402-13 Guidelines for specification and inspection of electric resistance welded (ERW) and seamless boiler tube for critical and non-critical service TIP 0502-14 Forming section monitoring TIP 0502-20 Catalog of Stock Preparation Pilot Plants TIP 1501-01 Industry 4.0 Lexicon
If you would like to join a Working Group of a TIP, please write to tip@tappi.org for more information.
|