Ready Mixed Concrete Production Updated Through April 2012

The preliminary estimate of ready mixed concrete production in April 2012 is 24.5 million cubic yards, 17.5% higher than April 2011. The estimate of ready mixed concrete produced through April is 80.5 million cubic yards, 19.2% higher than during the same period in 2011.

Ready mixed concrete production is estimated from cement shipments reported by the U.S. Geological Survey. More details are available for NRMCA members at this link.

National Ready Mixed Concrete Association