Monday, March 21, 2011 Archives | Advertise | Online Buyer's Guide | FLEETSolutions

Ford And DTE Energy Soak Up The Rays With One Of Michigan's Largest Solar Power Projects

Print Print this Article | Send to Colleague



The primary part of one of Michigan's largest solar power generation systems at Ford's Michigan Assembly Plant is now up and running, delivering renewable energy to help power the production of fuel-efficient small cars. The system is the result of collaboration between Ford, DTE Energy, Xtreme Power, the city of Wayne, and the state of Michigan.

The renewable energy captured by the energy system will help power the production of Ford's all-new Focus set to hit showrooms this month. The plant will also produce Focus Electric, Ford's first zero-emission battery electric passenger vehicle and the C-MAX Hybrid and C-MAX Energi plug-in hybrid.

The solar energy system will serve as a pilot alternative energy project to be evaluated for possible use at other Ford manufacturing facilities in the future. A secondary, smaller solar energy system will be integrated at Michigan Assembly to power lighting systems at the plant.

"This solar energy system allows us to test the viability of alternative energy to supply power for our manufacturing facilities around the world. It serves as a significant initiative within our corporate emphasis on sustainability," said Jim Tetreault, Ford Vice President, North America Manufacturing. "Michigan Assembly Plant has been transformed into a facility that embodies our drive for flexible manufacturing and strives for new standards for green manufacturing."

PrintShare on Facebook Share on Twitter Share on LinkedIn

Get Social
Facebook
LinkedIN
Twitter

Button 

 The CEI Group, Inc.
iiX Employment Screening Services
GoIndustry DoveBid
FleetLocate
NAFA Fleet Management Association
125 Village Blvd., Suite 200
Princeton, NJ 08540

Telephone: 609.720.0882 Fax: 609.452.8004