Exchanger

Mechanical Contractors Association of Canada

Member Update
The Mechanical Contractors Association of America, National Electrical Contractors Association and Sheet Metal and Air Conditioning Contractors’ National Association have aligned the MEP trades in a collaborative effort to create the white paper, Project-Specific Loss of Productivity Analysis Methodologies.

Visit https://www.mcaa.org/wp-content/uploads/2021/01/Project-Specific-Loss-of-Productivity-Analysis-Methodologies-2021_LR.pdf to view the full article online.

 
New Masterclass Webinar Series – 2021 Edition
Jonas Software®
Jonas’ all-in-one construction & service management software helps mechanical businesses likes yours optimize operations and be more profitable. Join our Masterclass Series webinars to learn how you can: 

-Save your company time and effort. 
-Gain better insight into your business.  
-Improve workflow efficiencies. 
-Grow your business. 
-Make better decisions. 
 
Click here to check out our upcoming masterclass webinar
Advertisement
INDUSTRY NEWS
Source: BuildForce Canada
"The year 2020 saw many organizations pledge to address systemic racism, but maintaining the momentum in 2021 will require visible and active leadership commitment. The BuildForce Respectful Workplace Online Toolkit provides three tools based on the proven practices of respectful and inclusive organizations to help address systemic racism: the Online Self-Assessment Tool, a Policy Framework and Implementation Guide, and the online course, 'Working in a Respectful and Inclusive Workplace.'"

Visit https://www.buildforce.ca/en/respectful-workplaces to view the full article online.

 
Source: HRAI
This hour-long session, led by Jeffrey Siegel, Ph.D., a professor in the engineering department at the University of Toronto, takes place on Jan. 26 at 12:00 p.m. ET.

Visit https://www.hpacmag.com/heating-plumbing-air-conditioning-general/hrai-hosting-webinar-on-iaq-and-covid-19-in-commercial-buildings/1004131211/ to view the full article online.

 
Source: WeForum.org
Emissions from buildings and the construction industry hit an all-time high in 2019. These emissions lower the chance of society meeting Paris Agreement targets. GlobalABC's new Buildings Climate Tracker also showed that the annual rate of progress on decarbonising buildings is slowing down.

Visit https://www.weforum.org/agenda/2021/01/planet-warming-emissions-buildings-construction-climate-goals-risk to view the full article online.

 
INNOVATION & TECHNOLOGY
Source: Plumbing + HVAC
"Wherever people gather these days, concerns about the spread of COVID-19 are top of mind. And while travel has been severely curtailed, places like Toronto Pearson Airport are doing their best to ensure those who do have to fly do so in a safe environment. To that end, Pearson recently installed UV-C light arrays in select air handling units at Terminals 1 and 3."

Visit https://plumbingandhvac.ca/pearson-airport-is-using-uv-c-light-to-disinfect-the-air-breathed-by-passengers/ to view the full article online.

 
BY THE NUMBERS
Click below for the latest prompt payment in the construction industry payment tables.

Visit https://www.tpsgc-pwgsc.gc.ca/biens-property/divulgation-disclosure/psdic-ppci-eng.html to view the full article online.

 
Source: On-Site Magazine
While most construction projects across Canada never came to a complete halt due to COVID-19 — and shutdowns at sites that did stop work were typically brief — the pandemic significantly affected the industry’s workforce.

Visit https://www.on-sitemag.com/labour/construction-loses-jobs-in-december-faces-spectre-of-further-lockdowns-in-january/1003971508/ to view the full article online.

 
Mechanical Contractors Association of Canada
280 Albert Street | Suite 701 | Ottawa ON, Canada K1P 5G8
Phone: (613)232-0492 | Fax: (613)235-2796 | Email: mcac@mcac.ca