Fix 50 Project Status

  • 85%

Projected Completion Date

Summer 2025

Announcements

Project Update: Thursday, May 9

This week, May 6 through May 10, expect lane, ramp and street closures along US-50 in Sacramento.

Nearby residents can expect loud construction noise as contractors are scheduled to perform demolition work, remove concrete, pour pavement, and conduct striping activities.

ALERT: On westbound US-50, the far right lane between 59th Street onramp and Stockton Boulevard exit is now “EXIT ONLY” for Stockton Boulevard. The lane has been re-striped and additional signage will be installed to indicate the new lane status.

REMINDER: There are currently 2 traffic splits and 2 shifts on westbound US-50. Please #BeWorkZoneAlert and always slow to 55 MPH in the construction zone.

*All work is scheduled to begin as listed but subject to change due to traffic incidents, weather, availability of equipment and/or materials, and construction related issues.

Nighttime Closures:

Thursday, May 9

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Boulevard onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • #1, 2 and 3 lanes from Howe Avenue to 59th Street
  • Howe Avenue onramp and auxiliary lane

Other

  • Southbound Folsom Boulevard shoulder
  • 9th Street and 10th Street between X St. and W St
  • Stockton Boulevard near the US-50 project zone
  • Folsom Boulevard near the US-50 project zone

Friday, May 10

Eastbound

  • Outside auxiliary lanes from I-5 to 16th Street
  • Riverside Boulevard onramp
  • 15th Street offramp
  • Inside (#1 and 2) lanes from Howe Avenue to 65th Street

Westbound

  • #1 and 2 lanes from Stockton Boulevard to 34th Street
  • Auxiliary lane between 59th Street onramp and Stockton Blvd. offramp
  • 59th Street onramp
  • Stockton Boulevard offramp
  • Howe Avenue onramp and auxiliary lane

Reminders and Resources

Crews are working around the clock so always Be Work Zone Alert. The speed limit in the work zone is 55 MPH and CHP will be patrolling the area to issue citations to motorists that exceed that limit.

General work schedule (subject to change): Day work from 5 AM – 8 PM; night work from 8 PM – 5 AM.

To submit complaints about noises or work, please fill out the ‘Contact Us’ form below or contact Caltrans Public Information Officer Dennis Keaton at dennis.keaton@dot.ca.gov.

Access more information on planned highway maintenance and construction work in District 3 here: https://lcswebreports.dot.ca.gov/searchdistricts?district=3 

For real-time highway conditions visit: https://quickmap.dot.ca.gov/ #KnowBeforeYouGo

Ongoing Project Work and Closures

  • Crews continue to work within the construction area from I-5  to Watt Avenue.
  • 35th Street is closed near the Stockton Boulevard off-ramp at US-50 and scheduled to reopen 2024.
  • Loud noises can be expected.

Thank you for your patience as we’re #RebuildingCa for years to come.

Contact Us

    Project Map

    Connect for the Latest Roadwork News


    14 hours ago

    Fix 50
    Please don't hesitate to ask us your questions. Visit Fix50.com/contact-us to request specific information about the #Fix50 project.Caltrans District 3 Caltrans HQ See MoreSee Less
    View on Facebook

    3 days ago

    Fix 50
    More sunshine = more progress. This spring, the Fix50 crews will be hard at work improving US-50.Please do your part and #BeWorkZoneAlert as they progress.Caltrans District 3 Caltrans HQ See MoreSee Less
    View on Facebook

    Be Work Zone Alert
    FHWA
    SACOG
    Caltrans
    SB1
    Measure A
    Sacramento Transportation Authority
    Protect Every Drop
    Caltrans' Winter Driving Tips
    California All COVID-19 Updates
    CHP
    Flatiron

     

    Caltrans' Quick Map