TAPPI Over The Wire Paper 360
Past Issues | Printer Friendly | TAPPI.org | Advertise | Buyers Guide | Travels with Larry Archive Facebook Twitter LinkedIn
       

Interfor to Take Additional Downtime in BC Interior

Print Print this Article | Send to Colleague

 
Interfor Corporation this week announced plans to temporarily reduce production across its operating platform in the B.C. Canada, interior during the month of June 2019 due to a combination of weak lumber prices and continuing high log costs. The curtailment is expected to reduce production in the region by approximately 20 million board feet for the month of June and will be taken by way of reduced operating days at each of the three BC Interior mills.

Interfor has three sawmills in the B.C. Interior, with total annual capacity of approximately 750 million board feet.
 

Back to TAPPI: Over The Wire

Share Share on Facebook Share on Twitter Share on LinkedIn