TAPPI Over The Wire Paper 360
Past Issues | Printer Friendly | TAPPI.org | Advertise | Buyers Guide | Travels with Larry Archive Facebook Twitter LinkedIn
       

Smurfit Kappa Nettingsdorf in Austria Orders Andritz to Supply Boiler Systems

Print Print this Article | Send to Colleague

 
Andritz (Austria) has received an order from Smurfit Kappa Nettingsdorf, part of the Smurfit Kappa Group (Ireland), to supply a HERB recovery boiler and a pre-evaporation plant for its mill in Nettingsdorf, Austria.

The new investments are part of the company’s Future Energy Project, which involves the implemention of sustainable energy initiatives at the Nettingsdorf mill. Start-up of the pre-evaporation plant and the new recovery boiler is scheduled for mid-2019 and mid-2020, respectively.

In addition to reducing emissions, the new HERB recovery boiler will produce more electricity than a traditional one. The boiler for Nettingsdorf will have several advanced features, including a smelt spout robot, an advanced sootblowing control with a hanging parts’ weight change indicator, and a process simulator. The EPC delivery scope covers mechanical equipment, automation, electrification, and instrumentation.

As a boost to energy efficiency at the mill, the new pre-evaporation plant utilizes ANDRITZ’s proven Mechanical Vapor Recompression (MVR) technology to increase the Nettingsdorf mill’s evaporation capacity. MVR units operate with very low specific energy consumption and also produce clean condensate that will be reused in other mill processes to minimize consumption of fresh water.

The new equipment will reinforce the industry-leading position that Smurfit Kappa Nettingsdorf currently holds due to its low energy consumption. Smurfit Kappa Nettingsdorf produces kraftliner.
 

Back to TAPPI: Over The Wire

Share Share on Facebook Share on Twitter Share on LinkedIn